==Status== | ==Status== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934 | |
− | * Sieves for both | + | Status: |
+ | |||
+ | * We got beam back this morning. | ||
+ | |||
+ | * Sieves for both arms are IN. SciFi for left arm is IN. | ||
+ | |||
+ | * Now working on the planed optics data taking for RHRS. | ||
+ | |||
+ | * SciFi + tungsten wire data from LHRS were collected as well. John is analyzing them. | ||
+ | |||
+ | * Yesterday, the high voltage of RHRS VDC tripped. Alex fixed that. | ||
==So Far== | ==So Far== | ||
− | * Total charge: ~19. | + | * Total charge: ~19.6C |
+ | |||
+ | [[File:APEX_charge_Mar5.png|x450px]] | ||
==Plan== | ==Plan== | ||
− | * | + | * It is anticipated that the optics data taking will be completed by 16:00. |
− | : | + | |
− | + | * Afterward, ~16:00, escorted access is needed for the Tech expert to change the polarities for RHRS magnets and Septum correctors. | |
− | + | ||
− | * | + | * After polarity change for the right arm, we will ramp up the magnets to 1.0632 GeV configuration. |
− | * | + | * We will go back to production data taking with Tungsten 2.8% target. |
==Slides/Links== | ==Slides/Links== |
Latest revision as of 15:45, 8 March 2019
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Jinlong Zhang
Contents
Status
Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934
Status:
- We got beam back this morning.
- Sieves for both arms are IN. SciFi for left arm is IN.
- Now working on the planed optics data taking for RHRS.
- SciFi + tungsten wire data from LHRS were collected as well. John is analyzing them.
- Yesterday, the high voltage of RHRS VDC tripped. Alex fixed that.
So Far
- Total charge: ~19.6C
Plan
- It is anticipated that the optics data taking will be completed by 16:00.
- Afterward, ~16:00, escorted access is needed for the Tech expert to change the polarities for RHRS magnets and Septum correctors.
- After polarity change for the right arm, we will ramp up the magnets to 1.0632 GeV configuration.
- We will go back to production data taking with Tungsten 2.8% target.
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934