==Status==
 
==Status==
 
Experiment:
 
Experiment:
=No beam study and no RF convey this week=
+
 
 +
No beam study and no RF recovery this week
  
 
https://logbooks.jlab.org/entry/3665804
 
https://logbooks.jlab.org/entry/3665804
 +
https://logbooks.jlab.org/entry/3666105
  
 
* Taking the production runs during the weekend (03/09 and 03/10).   
 
* Taking the production runs during the weekend (03/09 and 03/10).   
Line 37: Line 39:
 
* During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). Jack was able to check the issue by going down to the hall (https://logbooks.jlab.org/entry/3665788), and he ended up with a working plan on Monday.  
 
* During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). Jack was able to check the issue by going down to the hall (https://logbooks.jlab.org/entry/3665788), and he ended up with a working plan on Monday.  
  
* At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from  the four temperature sensors. Target on Call was called, and the issue may need to power cycle the target computer.  
+
* At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from  the four temperature sensors. Target on Call was called, and the issue may need to power cycle the raspberry-pi target computer." If rebooting the raspberry-pi that controls the target
 +
temperature sensors does not bring back their readings we can carry on with the experiment." ---from Silviu.  [[https://hallaweb.jlab.org/wiki/images/8/80/TG_temperature_simulation.pdf]]
  
 
The above 2 issues need a control access to the Hall, and we plan to have Jack/Ethan and Silviu to work on the issue on Monday 3pm.
 
The above 2 issues need a control access to the Hall, and we plan to have Jack/Ethan and Silviu to work on the issue on Monday 3pm.
Line 44: Line 47:
  
 
*Collect the production run data with both working Right and Left HRS at 40uA.
 
*Collect the production run data with both working Right and Left HRS at 40uA.
 +
 +
* Insert sieve on the left arm, and do the optics run for HRS T1=T4=1, others keeps to 0, see the run plan[[https://hallaweb.jlab.org/wiki/images/8/8d/LHRS_optics.pdf]]
  
 
*plans for the down time during production run.  
 
*plans for the down time during production run.  

Latest revision as of 15:14, 11 March 2019

Back to:

Main Page
Daily Run Meetings
halog

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Ye Tian


Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934

Status

Experiment:

No beam study and no RF recovery this week

https://logbooks.jlab.org/entry/3665804 https://logbooks.jlab.org/entry/3666105

  • Taking the production runs during the weekend (03/09 and 03/10).
  • The production (no LHRS NMR and target alarm silent) with monitoring the from run 4729-4759

Hall:

1) escorted access by ARM and John to reset SciFi motion system

2) escorted access by Jack to reboot the LHRS IOC (https://logbooks.jlab.org/entry/3665788)

3) control access planed at 3:00 pm to install the new LHRS NMR IOC portserver/bad wire and Sieliu will restart the target computer. Meanwhile we insert sieve on the left arm to start optics runs after the access.

Issue

temperature sensors does not bring back their readings we can carry on with the experiment." ---from Silviu. [[1]]

The above 2 issues need a control access to the Hall, and we plan to have Jack/Ethan and Silviu to work on the issue on Monday 3pm.

Plan

  • Collect the production run data with both working Right and Left HRS at 40uA.
  • Insert sieve on the left arm, and do the optics run for HRS T1=T4=1, others keeps to 0, see the run plan[[2]]
  • plans for the down time during production run.
    • Left HRS magnet down, then take the right HRS optics run (positron)
    • Right HRS magnet down, then take the left HRS optics run

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934