  - HV test on N2 of the 4 modules of layer#2 done OK again see link: [https://hallaweb.jlab.org/dvcslog/SBS/266 https://hallaweb.jlab.org/dvcslog/SBS/266]
 
  - HV test on N2 of the 4 modules of layer#2 done OK again see link: [https://hallaweb.jlab.org/dvcslog/SBS/266 https://hallaweb.jlab.org/dvcslog/SBS/266]
 
   
 
   
  - Plan to do HV test of the GEMs or layer#1 on the cosmic stand again and then move layer#2 on the cosmic stand as well
+
  -HV test ongoing the 4 GEMs or layer#1 on the cosmic stand today
 
   
 
   
  - 34 UVa long cables for layer#2 + a set of MONO cables for one module delivered
+
  - The plan is to move layer#2 on the cosmic stand soon => some work needed on the cosmic stand before moving the second layer
 
   
 
   
  - We will have to setup a standalone test bench of backplane + APVs before mounting on the chambers (see Siyu's slides)
+
  - 34 UVa long cables for layer#2 + a set of MONO cables for one module delivered => two set of cables will be tested on PREX GEMs in the next two weeks
+
 
  - First versions of the backplanes support on the Alu frames 3D printed => Need small modifications about dimensions => second iteration underway
+
  - First iteration of the back planes support on the Alu frames 3D printed (see slides) => Need small modifications about dimensions => second iteration underway
 
   
 
   
 
  - Got long HV cables from Bogdan for the Clean room GEM layers  
 
  - Got long HV cables from Bogdan for the Clean room GEM layers  
 
   
 
   
  - Need someone for the test of the divider and PMT for these modules with the help from Bogdan
+
  - Need people to setup a standalone test bench of APVs on backplanes and for the test of the divider and PMT for these modules with the help from Bogdan
+
- We start assembly of PREX GEMs (Siyu) => will keep us busy for the next 3 weeks => delay the UVa GEM layer assembly.
+
 
   
 
   
 +
- We started assembly of PREX GEMs (Siyu) => will keep us busy for the next 3 weeks => delay the UVa GEM layer assembly.
  
 
=== Update from Siyu ===
 
=== Update from Siyu ===

Latest revision as of 09:04, 11 April 2019

GMn GEM commissioning Meetings: Thursday 9:00am - 10:00pm

Link to all previous meetings: GMn GEM Commissioning Meeting


Kondo, ... 

Update on UVa GEM commissioning (Kondo)

- HV test on N2 of the 4 modules of layer#2 done OK again see link: https://hallaweb.jlab.org/dvcslog/SBS/266

-HV test ongoing the 4 GEMs or layer#1 on the cosmic stand today 

- The plan is to move layer#2 on the cosmic stand soon => some work needed on the cosmic stand before moving the second layer

- 34 UVa long cables for layer#2 + a set of MONO cables for one module delivered => two set of cables will be tested on PREX GEMs in the next two weeks
 
- First iteration of the back planes support on the Alu frames 3D printed (see slides) => Need small modifications about dimensions => second iteration underway

- Got long HV cables from Bogdan for the Clean room GEM layers 

- Need people to setup a standalone test bench of APVs on backplanes and for the test of the divider and PMT for these modules with the help from Bogdan

- We started assembly of PREX GEMs (Siyu) => will keep us busy for the next 3 weeks => delay the UVa GEM layer assembly.

Update from Siyu

Update from Tongtong and Malinga

Update on INFN GEM commissioning (Evaristo)

Update on MPD electronics (Paolo)