== Agenda ==
 
== Agenda ==
  
* (30) Executive Session
+
* (30) ''Executive Session''
* (5) Remarks from Chair and Charge
+
* (5) ''Remarks from Chair and Charge''
* (20+10) Charge Items 1, 5, 6: General overview, new equipment (beyond those in common with E12-09-019), and impact and integration with E12-09-019 run plan
+
* (20+10) '''Charge Items 1, 5, 6''': ''General overview, new equipment (beyond those in common with E12-09-019), and impact and integration with E12-09-019 run plan
* (20+10) Charge Items 1, 5--8: Apparatus ownership, maintenance and control, safety documentation and procedures
+
''* (20+10) '''Charge Items 1, 5--8''': ''Apparatus ownership, maintenance and control, safety documentation and procedures''
* (20+10) Charge Item 2, 2e, 6: E12-09-019 specific hardware, completion/commissioning schedule and tasks
+
* (20+10) '''Charge Item 2, 2e, 6''': ''E12-09-019 specific hardware, completion/commissioning schedule and tasks''
** (20+10) Charge Item 2a: GEMs and associated electronics
+
** (20+10) '''Charge Item 2a''': ''GEMs and associated electronics''
** (20+10) Charge Item 2b, 2d: Charge-Exchange polarimetry hardware
+
** (20+10) '''Charge Item 2b, 2d''': ''Charge-Exchange polarimetry hardware''
** (20+10) Charge Item 2b, 2d: Large Angle polarimetry hardware
+
** (20+10) '''Charge Item 2b, 2d''': ''Large Angle polarimetry hardware''
* (20+10) Charge Item 3a, 3b, 4: Simulation, analysis software and publication timeline
+
* (20+10) '''Charge Item 3a, 3b, 4''': ''Simulation, analysis software and publication timeline''
* (20+10) Charge Item 2c: Mechanical design, engineering
+
* (20+10) '''Charge Item 2c''': ''Mechanical design, engineering''
* Executive Session
+
* ''Executive Session''
* Close Out
+
* ''Close Out''
  
 
== Document Drafts ==
 
== Document Drafts ==

Revision as of 22:13, 28 April 2019

E12-17-004 Experimental Readiness Review 2019 (Hall A)

Time and Location

  • Date: May 29, 2019
  • Location: CEBAF Center Room L102
  • ERR Charge: ERR Charge
  • ERR Committee: Howard Fenker (chair), Lubomir Pentchev, Chris Cuevas, Pavel Degtiarenko, Bert Manzlak, Ed Folts (observer), Javier Gomez (observer)

Agenda

  • (30) Executive Session
  • (5) Remarks from Chair and Charge
  • (20+10) Charge Items 1, 5, 6: General overview, new equipment (beyond those in common with E12-09-019), and impact and integration with E12-09-019 run plan

* (20+10) Charge Items 1, 5--8: Apparatus ownership, maintenance and control, safety documentation and procedures

  • (20+10) Charge Item 2, 2e, 6: E12-09-019 specific hardware, completion/commissioning schedule and tasks
    • (20+10) Charge Item 2a: GEMs and associated electronics
    • (20+10) Charge Item 2b, 2d: Charge-Exchange polarimetry hardware
    • (20+10) Charge Item 2b, 2d: Large Angle polarimetry hardware
  • (20+10) Charge Item 3a, 3b, 4: Simulation, analysis software and publication timeline
  • (20+10) Charge Item 2c: Mechanical design, engineering
  • Executive Session
  • Close Out