Difference between revisions of "E12-17-004-ERR-29May2019"
From Hall A Wiki
(→Agenda) |
(→E12-17-004 Experimental Readiness Review 2019 (Hall A)) |
||
Line 2: | Line 2: | ||
* [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=919 E12-17-004: Measurement of the Ratio GEn/GMn by the Double-polarized 2H(e,e'n) Reaction] in Hall A | * [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=919 E12-17-004: Measurement of the Ratio GEn/GMn by the Double-polarized 2H(e,e'n) Reaction] in Hall A | ||
+ | ** [[Media:E12-17-004-proposal.pdf|Local copy of proposal]] | ||
* [https://www.jlab.org/physics/experiment_process/np-pfx-chart JLab Experimental Readiness Review Chart] | * [https://www.jlab.org/physics/experiment_process/np-pfx-chart JLab Experimental Readiness Review Chart] |
Revision as of 10:38, 22 May 2019
Contents
E12-17-004 Experimental Readiness Review 2019 (Hall A)
Time and Location
- Date: May 29, 2019
- Location: CEBAF Center Room L102
- ERR Charge: ERR Charge
- ERR Committee: Howard Fenker (chair), Lubomir Pentchev, Chris Cuevas, Pavel Degtiarenko, Bert Manzlak, Ed Folts (observer), Javier Gomez (observer)
Agenda
- 08:00 (25) Executive Session
- 08:25 (5) Remarks from Chair and Charge
- 08:30 (30+10) Charge Items 1, 2e, 5—8: Overview, equipment, ownership, schedule, etc -- Brad Sawatzky
- New equipment (beyond those in common with E12-09-019)
- Apparatus ownership, maintenance and control, safety documentation and procedures
- Completion/commissioning schedule and tasks for new equipment
- Impact and integration with E12-09-019 run plan
- New equipment (beyond those in common with E12-09-019)
- 9:10 (20+10) Charge Item 2c: Mechanical design, engineering -- Robin Wines
- 9:40 (20+10) Charge Item 2a: GEMs and associated electronics -- Kondo Gnanvo
- 10:10 ~ Coffee Break ~
- 10:30 (20+10) Charge Item 2b, 2d, 3b: Neutron polarimetry details (Ch. Ex & Proton recoil) -- David Hamilton
- 11:00 (20+10) Charge Item 3a, 4: Simulation, analysis software and publication timeline -- Will Tireman
- 11:30 Discussion as needed
- 12:00 ~ Lunch ~
- 13:00 Executive Session
- 15:00 Close Out
Document Drafts
NOTE: The COO, ESAD, ERG, SBS OSPs, etc from GMn (E12-09-019) will cover E12-17-004 as well. GEM, hodoscope, and neutron analyzer controls are identical. No hardware with unique characteristics is being added to the system.