Difference between revisions of "E12-17-004-ERR-29May2019"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(E12-17-004 Experimental Readiness Review 2019 (Hall A))
Line 2: Line 2:
  
 
* [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=919 E12-17-004: Measurement of the Ratio GEn/GMn by the Double-polarized 2H(e,e'n) Reaction] in Hall A
 
* [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=919 E12-17-004: Measurement of the Ratio GEn/GMn by the Double-polarized 2H(e,e'n) Reaction] in Hall A
 +
** [[Media:E12-17-004-proposal.pdf|Local copy of proposal]]
  
 
* [https://www.jlab.org/physics/experiment_process/np-pfx-chart JLab Experimental Readiness Review Chart]
 
* [https://www.jlab.org/physics/experiment_process/np-pfx-chart JLab Experimental Readiness Review Chart]

Revision as of 10:38, 22 May 2019

E12-17-004 Experimental Readiness Review 2019 (Hall A)

Time and Location

  • Date: May 29, 2019
  • Location: CEBAF Center Room L102
  • ERR Charge: ERR Charge
  • ERR Committee: Howard Fenker (chair), Lubomir Pentchev, Chris Cuevas, Pavel Degtiarenko, Bert Manzlak, Ed Folts (observer), Javier Gomez (observer)

Agenda

  • 08:00 (25) Executive Session
  • 08:25 (5) Remarks from Chair and Charge
  • 08:30 (30+10) Charge Items 1, 2e, 5—8: Overview, equipment, ownership, schedule, etc -- Brad Sawatzky
    • New equipment (beyond those in common with E12-09-019)
      • Apparatus ownership, maintenance and control, safety documentation and procedures
      • Completion/commissioning schedule and tasks for new equipment
    • Impact and integration with E12-09-019 run plan
  • 9:10 (20+10) Charge Item 2c: Mechanical design, engineering -- Robin Wines
  • 9:40 (20+10) Charge Item 2a: GEMs and associated electronics -- Kondo Gnanvo
  • 10:10 ~ Coffee Break ~
  • 10:30 (20+10) Charge Item 2b, 2d, 3b: Neutron polarimetry details (Ch. Ex & Proton recoil) -- David Hamilton
  • 11:00 (20+10) Charge Item 3a, 4: Simulation, analysis software and publication timeline -- Will Tireman
  • 11:30 Discussion as needed
  • 12:00 ~ Lunch ~
  • 13:00 Executive Session
  • 15:00 Close Out

Document Drafts

NOTE: The COO, ESAD, ERG, SBS OSPs, etc from GMn (E12-09-019) will cover E12-17-004 as well.  GEM, hodoscope, and neutron analyzer controls are identical.  No hardware with unique characteristics is being added to the system.