Difference between revisions of "Meeting 2019 07 25"
From Hall A Wiki
(→Main topic) |
(→Main topic) |
||
Line 7: | Line 7: | ||
=== Main topic === | === Main topic === | ||
− | * Discuss preparation of the SBS Coll. Meeting / GMn, GEn-RP Preparedness Review | + | * Discuss preparation of the SBS Coll. Meeting / GMn, GEn-RP Preparedness Review [[Media:1908_BB-GEM_GMn.pdf|very preliminary draft GEM-BB presentation]] |
− | + | ||
* Response to the ERR (Brad spreadsheet ..) | * Response to the ERR (Brad spreadsheet ..) |
Revision as of 04:02, 25 July 2019
GMn GEM commissioning Meetings: Thursday 9:00am - 10:00pm
Link to all previous meetings: GMn GEM Commissioning Meeting
Kondo, ...
Contents
- 1 Main topic
- 2 Update on INFN GEM commissioning (Leo, Evaristo)
- 3 Update on MPD electronics (Paolo)
- 4 Update on the Tracking efficiency / resolution (Andrew)
- 5 Update on INFN GEM commissioning (Kondo)
- 6 Tests of long HDMI cables, backplanes on teh GEM layer #3 (Thir)
- 7 Assembly of GEM layer #3 (Anu, Malinga)
- 8 Update on PREX GEM (Siyu)
- 9 AOB
Main topic
- Discuss preparation of the SBS Coll. Meeting / GMn, GEn-RP Preparedness Review very preliminary draft GEM-BB presentation
- Response to the ERR (Brad spreadsheet ..)