* Discuss preparation of the SBS Coll. Meeting / GMn, GEn-RP Preparedness Review  
+
* Discuss preparation of the SBS Coll. Meeting / GMn, GEn-RP Preparedness Review
  [[Media:1908_BB-GEM_GMn.pdf|very preliminary draft GEM-BB presentation]]
+
  
 
* Response to the ERR (Brad spreadsheet ..)
 
* Response to the ERR (Brad spreadsheet ..)
Line 14: Line 13:
 
===  Update on INFN GEM commissioning (Leo, Evaristo) ===
 
===  Update on INFN GEM commissioning (Leo, Evaristo) ===
  
*
+
* Next visit at JLab: from Aug/21th to Sep/17th (preliminary plan: https://hallaweb.jlab.org/wiki/images/6/6c/FrontTracker_Aug-Sep19_plan.xlsx.zip)
 +
 
 +
[[Media:1908_BB-GEM_GMn.pdf|very preliminary draft GEM-BB presentation (Evaristo)]]
  
 
===  Update on MPD electronics (Paolo) ===
 
===  Update on MPD electronics (Paolo) ===
Line 24: Line 25:
 
*
 
*
  
===  Update on INFN GEM commissioning (Kondo) ===
+
===  Update on UVa GEM commissioning (Kondo) ===
  
 
*
 
*
  
=== Tests of long HDMI cables, backplanes on teh GEM layer #3 (Thir) ===
+
=== Tests of long HDMI cables, backplanes on the GEM layer #3 (Thir) ===
  
 
*
 
*

Latest revision as of 12:57, 28 July 2019

GMn GEM commissioning Meetings: Thursday 9:00am - 10:00pm

Link to all previous meetings: GMn GEM Commissioning Meeting


Kondo, ... 

Main topic

  • Discuss preparation of the SBS Coll. Meeting / GMn, GEn-RP Preparedness Review
  • Response to the ERR (Brad spreadsheet ..)

Update on INFN GEM commissioning (Leo, Evaristo)

very preliminary draft GEM-BB presentation (Evaristo)

Update on MPD electronics (Paolo)

Update on the Tracking efficiency / resolution (Andrew)

Update on UVa GEM commissioning (Kondo)

Tests of long HDMI cables, backplanes on the GEM layer #3 (Thir)

Assembly of GEM layer #3 (Anu, Malinga)

Update on PREX GEM (Siyu)

AOB