Difference between revisions of "SBS DAQ meetings"
(→October 4th 2019) |
|||
Line 3: | Line 3: | ||
*Bigbite DAQ status ( Eric ) | *Bigbite DAQ status ( Eric ) | ||
+ | -slide here | ||
+ | -Eric should look at existing PODD classes for shower to decode Fastbus | ||
+ | -Shower trigger : less than 200 ns | ||
+ | -test trigger lines : 190 ns | ||
− | *HCAL DAQ status | + | *HCAL DAQ status ( Scott ) |
+ | -2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC | ||
+ | -see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates ) | ||
+ | -resolution lock issue with F1, might be overheating | ||
+ | -add blanks to improve cooling | ||
+ | -reduce resolution of F1 to see if problem goes away | ||
+ | - latency from TI ( OT2 is prompt output less delay down to 200 ns) | ||
+ | |||
+ | *UVA GEM status (Byran / Kondo ) | ||
+ | - 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver | ||
+ | -using CODA3 | ||
+ | -wiki with information on wiki : | ||
+ | -computer ready soon | ||
+ | -3rd (VXS) crate with SSP and MPDs | ||
+ | |||
+ | *SSP readout ( Ben ) | ||
+ | - 16 MPD for 1 SSP to be tested | ||
+ | - all transceiver and fibers on site | ||
+ | - test radiation hardness of transceivers and fibers | ||
+ | |||
+ | *BCM digital : | ||
+ | - daughter board design done, need to make prototypes and test | ||
+ | |||
+ | |||
+ | *Certification of electronics : need to check with Ed Folts ( Nilanga question ) |
Revision as of 11:41, 4 October 2019
October 4th 2019
- Bigbite DAQ status ( Eric )
-slide here -Eric should look at existing PODD classes for shower to decode Fastbus -Shower trigger : less than 200 ns -test trigger lines : 190 ns
- HCAL DAQ status ( Scott )
-2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC -see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates ) -resolution lock issue with F1, might be overheating -add blanks to improve cooling -reduce resolution of F1 to see if problem goes away - latency from TI ( OT2 is prompt output less delay down to 200 ns)
- UVA GEM status (Byran / Kondo )
- 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver -using CODA3 -wiki with information on wiki : -computer ready soon -3rd (VXS) crate with SSP and MPDs
- SSP readout ( Ben )
- 16 MPD for 1 SSP to be tested - all transceiver and fibers on site - test radiation hardness of transceivers and fibers
- BCM digital :
- daughter board design done, need to make prototypes and test
- Certification of electronics : need to check with Ed Folts ( Nilanga question )