Difference between revisions of "SBS DAQ meetings"
From Hall A Wiki
(→October 4th 2019) |
(→October 4th 2019) |
||
Line 3: | Line 3: | ||
*Bigbite DAQ status ( Eric ) | *Bigbite DAQ status ( Eric ) | ||
− | **slide here | + | **slide here [[https://hallaweb.jlab.org/wiki/index.php/File:FB_daq_status_20191004.pdf |
+ | pdf]] | ||
**Eric should look at existing PODD classes for shower to decode Fastbus | **Eric should look at existing PODD classes for shower to decode Fastbus | ||
**Shower trigger : less than 200 ns | **Shower trigger : less than 200 ns |
Revision as of 11:51, 4 October 2019
October 4th 2019
- Bigbite DAQ status ( Eric )
pdf]]
- Eric should look at existing PODD classes for shower to decode Fastbus
- Shower trigger : less than 200 ns
- test trigger lines : 190 ns
- HCAL DAQ status ( Scott )
- 2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC
-see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates ) -resolution lock issue with F1, might be overheating -add blanks to improve cooling -reduce resolution of F1 to see if problem goes away - latency from TI ( OT2 is prompt output less delay down to 200 ns)
- UVA GEM status (Byran / Kondo )
- 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver -using CODA3 -wiki with information on wiki : -computer ready soon -3rd (VXS) crate with SSP and MPDs
- SSP readout ( Ben )
- 16 MPD for 1 SSP to be tested - all transceiver and fibers on site - test radiation hardness of transceivers and fibers
- BCM digital :
- daughter board design done, need to make prototypes and test
- Certification of electronics : need to check with Ed Folts ( Nilanga question )
- CDet
- All TDC for coordinate in weldment : need checks ?
- Software : running DAQ CODA and root scripts to analyze, need to check if other functionalities needed. Library can be loaded in Hall A / SBS analyzer
- amount of TDCs for CDet sufficient
- 25 TDCs - need to check with Bob