Line 3: Line 3:
  
 
*Bigbite DAQ status ( Eric )
 
*Bigbite DAQ status ( Eric )
**slide here [https://hallaweb.jlab.org/wiki/index.php/File:FB_daq_status_20191004.pdf
+
**slide here [https://hallaweb.jlab.org/wiki/index.php/File:FB_daq_status_20191004.pdf pdf]
pdf]
+
 
** taking data but timing needs to be done to look at detector signals
 
** taking data but timing needs to be done to look at detector signals
**Eric should look at existing PODD classes for shower to decode Fastbus
+
** Eric should look at existing PODD classes for shower to decode Fastbus
**Shower trigger  : less than 200 ns  
+
** Shower trigger  : less than 200 ns  
**test trigger lines : 190 ns might  
+
** test trigger lines : 190 ns might  
  
  
*HCAL DAQ status ( Scott )
+
* HCAL DAQ status ( Scott )
**2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC
+
** 2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC
-see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates )
+
:- see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates )
-resolution lock issue with F1, might be overheating  
+
:- resolution lock issue with F1, might be overheating  
-add blanks to improve cooling
+
:- add blanks to improve cooling
-reduce resolution of F1 to see if problem goes away
+
:- reduce resolution of F1 to see if problem goes away
- latency from TI ( OT2 is prompt output less delay down to 200 ns)
+
:- latency from TI ( OT2 is prompt output less delay down to 200 ns)
  
*UVA GEM status (Byran / Kondo )
 
- 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver
 
-using CODA3
 
-wiki with information on wiki :
 
-computer ready soon
 
-3rd (VXS) crate with SSP and MPDs
 
  
*SSP readout ( Ben )  
+
* UVA GEM status (Bryan / Kondo )
- 16 MPD for 1 SSP to be tested
+
:- 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver
- all transceiver and fibers on site
+
:- using CODA3
- test radiation hardness of transceivers and fibers
+
:- wiki with information on wiki : [[SBS_DAQ:_GEM_EEL_Cleanroom_setup]]
 +
:- computer ready soon
 +
:- 3rd (VXS) crate with SSP and MPDs
 +
 
 +
 
 +
* SSP readout ( Ben )  
 +
:- 16 MPD for 1 SSP to be tested
 +
:- all transceiver and fibers on site
 +
:- test radiation hardness of transceivers and fibers
 +
 
  
 
*BCM digital :  
 
*BCM digital :  
- daughter board design done, need to make prototypes and test
+
:- daughter board design done, need to make prototypes and test
  
  
 
*Certification of electronics : need to check with Ed Folts ( Nilanga question )
 
*Certification of electronics : need to check with Ed Folts ( Nilanga question )
 +
  
 
*CDet
 
*CDet

Revision as of 12:01, 4 October 2019

October 4th 2019

  • Bigbite DAQ status ( Eric )
    • slide here pdf
    • taking data but timing needs to be done to look at detector signals
    • Eric should look at existing PODD classes for shower to decode Fastbus
    • Shower trigger  : less than 200 ns
    • test trigger lines : 190 ns might


  • HCAL DAQ status ( Scott )
    • 2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC
- see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates )
- resolution lock issue with F1, might be overheating
- add blanks to improve cooling
- reduce resolution of F1 to see if problem goes away
- latency from TI ( OT2 is prompt output less delay down to 200 ns)


  • UVA GEM status (Bryan / Kondo )
- 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver
- using CODA3
- wiki with information on wiki : SBS_DAQ:_GEM_EEL_Cleanroom_setup
- computer ready soon
- 3rd (VXS) crate with SSP and MPDs


  • SSP readout ( Ben )
- 16 MPD for 1 SSP to be tested
- all transceiver and fibers on site
- test radiation hardness of transceivers and fibers


  • BCM digital :
- daughter board design done, need to make prototypes and test


  • Certification of electronics : need to check with Ed Folts ( Nilanga question )


  • CDet
    • All TDC for coordinate in weldment : need checks ?
    • Software : running DAQ CODA and root scripts to analyze, need to check if other functionalities needed. Library can be loaded in Hall A / SBS analyzer
    • amount of TDCs for CDet sufficient
    • 25 TDCs - need to check with Bob