Difference between revisions of "Wednesday, November 13, 2019, 11:00 EST"
From Hall A Wiki
(→Laser) |
(→Electron detector) |
||
Line 22: | Line 22: | ||
=== Electron detector === | === Electron detector === | ||
* Detector installation | * Detector installation | ||
+ | ** motion ok | ||
+ | ** noise from Analog boards about +/-5 mV | ||
+ | ** might be issue with plane A (2uA) and D (12uA), plane B 25 nA, meter for thick plane might have died from radiation | ||
+ | ** adapters still need to be done | ||
+ | ** VXS crate installed with VETROC, VTP installed, need to configure NFS mounts to work | ||
+ | ** almost ready to look at cosmics | ||
* QWAD adapter boards | * QWAD adapter boards | ||
* Counting DAQ | * Counting DAQ |
Revision as of 11:10, 13 November 2019
Back to Main Compton Page >> Compton Meetings
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Contents
Agenda
Meeting room = Cebaf Center F227
General
- Hall A will start earlier than originally planned - Monday, November 25
- Hall will be locked up for high current test Wednesday or Thursday
Electron detector
- Detector installation
- motion ok
- noise from Analog boards about +/-5 mV
- might be issue with plane A (2uA) and D (12uA), plane B 25 nA, meter for thick plane might have died from radiation
- adapters still need to be done
- VXS crate installed with VETROC, VTP installed, need to configure NFS mounts to work
- almost ready to look at cosmics
- QWAD adapter boards
- Counting DAQ
Laser
- Mirrors replaced
- Entrance scans
- Cavity birefringence scans
- Polarization strategy
Photon Detector
- PREX checks - complete (?)
- CREX preparations
Analysis
- ACC0 - laser-cycle analysis
- ACC4 - laser cycle analysis