Difference between revisions of "SBS 2020 GEn Experimental Readiness Review"

From Hall A Wiki
Jump to: navigation, search
m
m
Line 3: Line 3:
 
[http://hallaweb.jlab.org/12GeV/SuperBigBite/ (Super Bigbite webpage)]
 
[http://hallaweb.jlab.org/12GeV/SuperBigBite/ (Super Bigbite webpage)]
  
========== ALL OF THIS IS IN PROGRESS!!! ============================
 
 
== Experimental Readiness Review  2020 ==
 
== Experimental Readiness Review  2020 ==
 
* '''Date:''' October 22, 2020, Thursday <br>
 
* '''Date:''' October 22, 2020, Thursday <br>
Line 13: Line 12:
 
* ''' ERR Charge ''' ([https://hallaweb.jlab.org/wiki/images/e/e0/HallA_SBS-E12-09-016_ERR_Charge.pdf pdf])
 
* ''' ERR Charge ''' ([https://hallaweb.jlab.org/wiki/images/e/e0/HallA_SBS-E12-09-016_ERR_Charge.pdf pdf])
 
* ''' Proposal ''' ([https://www.jlab.org/exp_prog/proposals/09/PR12-09-016.pdf pdf])
 
* ''' Proposal ''' ([https://www.jlab.org/exp_prog/proposals/09/PR12-09-016.pdf pdf])
 
========== ALL OF THIS IS IN PROGRESS!!! ============================
 
  
 
=='''Agenda'''==
 
=='''Agenda'''==
Line 64: Line 61:
 
|
 
|
 
|-
 
|-
========== ALL OF THIS IS IN PROGRESS!!! ============================
 
 
| ||    Draft of COO ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/COO.pdf pdf])  ||  
 
| ||    Draft of COO ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/COO.pdf pdf])  ||  
 
|-
 
|-
Line 86: Line 82:
 
|-
 
|-
 
| ||    Draft of OSP for Coordinate Detector, CDet ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/CDet_OSP.pdf pdf])  ||  
 
| ||    Draft of OSP for Coordinate Detector, CDet ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/CDet_OSP.pdf pdf])  ||  
========== ALL OF THIS IS IN PROGRESS!!! ============================
 
 
|}
 
|}

Revision as of 16:51, 5 October 2020

Overview

Hall A E12-09-016 (Measurement of the Neutron Electromagnetic Form Factor Ration GEn/GMn at High Q2) Experiment Readiness Review (Super Bigbite webpage)

Experimental Readiness Review 2020

  • Date: October 22, 2020, Thursday
  • Location: Remote (Bluejeans link: "TO BE ADDED")
  • ERR Committee Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation),

Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q),

Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)

  • ERR Charge (pdf)
  • Proposal (pdf)

Agenda

Thursday Morning Session
8:00 Closed Session-Does the committee need this? , (30)
8:30 Remarks from Chair and Charge Chair (10)
8:40 Experiment Overview Bogdan Wojtsekhowski (10+10)
9:00 Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors to accommodate polarized target Robin Wines (20+10)
9:30 Charge Items 2, 3: Target Introduction/Overview Gordon Cates (10+5)
9:45 Charge Item 2 (target): Integrated System-Target Design and Fabrication Bert Metzger (20 + 10) ?
10:15 Break (15)
10:30 Charge Item 2: Target configuration, performance requirement, Subsystems, including cells and lasers, lessons learned and timeline Gordon Cates (40 + 20)
11:30 Charge Item 3: Effect of Spectrometer fields, Magnetic Shielding and Simulation Vladimir Nelyubin (20+10) ?
12:00 Lunch (60)
Afternoon Session
13:00 Charge Item 2 (non-target): Status of the equipment required for this experiment. Completion, commissioning. Mark Jones (30+10)
13:30 Charge Items 1, 2, 4: Equipment ownership, maintenance, control. Installation plans, timeline Jessie Butler (20 + 10) ?
14:00 Charge Item 5: Data Analysis & Simulation, Software Status, time to 1st publication Andrew Puckett (20+10) ?
14:30 Break (20)
14:50 Charge Item 6: Radiation and Shielding Pavel Degtairenko (20+10) ?
15:20 Charge Item 7: Beam Commissioning and Yves Roblin (20+10) ?
15:50 Charge Item 4: Personpower and responsibilities Todd Averett (20+10)
16:20 Charge Item 8: Safety Documents, target and non-target Jian-ping Chen ?, Todd Averett (20+10)
16:50 Closeout Session
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
Input for RSAD from Radcon (radiation budget form) (pdf) and (pdf)
Draft of OSP for GEM detectors (pdf)
Draft of OSP for BigBite magnet (pdf)
Draft of OSP for BigBite rotation (pdf)
Draft of OSP GRINCH Cherenkov detector (pdf)
Draft of OSP for BigBite timing hodoscope (pdf)
Draft of OSP for Hadron Calorimeter, HCal-J (pdf)
Draft of OSP for Coordinate Detector, CDet (pdf)