*Updates
 
*Updates
 
** HCAL
 
** HCAL
 +
*** cosmics working on right side - checking cabling - still DMA transfer error
 +
*** prescale set to 0 to get all the trigger - was set to 1 so was taking half
 +
*** could try to swap FADC from bottom to top crate
 +
*** try with bus analyzer ?
 +
*** Bryan will check readout list
 
** Bigbite Shower
 
** Bigbite Shower
 +
*** PMTs replaced , starting taking data yesterday - will take data over week-end - and switch to CODA3 maybe Tuesday
 
** INFN GEM
 
** INFN GEM
 +
*** running cosmics on week-end with CODA3 - running stable - replacing cable trays and will retest - no need to power cycle low voltage - 3 M events run
 
** UVA GEM
 
** UVA GEM
 +
*** replaced one MPD which was giving read out errors - need to look at data - no errors seen with new MPD
 
** BigBite GEM
 
** BigBite GEM
 +
*** set of 5 APV for testing in TEDF, crates and modules installed
 
** Hodoscope
 
** Hodoscope
 +
*** Mark gave HV write up, can control HV
 +
*** next set of 16 almost ready
 +
*** will setup TDC after switch to CODA3
 
** CDet
 
** CDet
 +
***still debugging few individual channels
 +
*** Update on Wednesday -  might need to reboot after - update in mounting /site , update should be done through puppet
 
** LHRS
 
** LHRS
 +
*** getting started with intel CPUs and new TI for LHRS
 +
 +
* GEM DAQ rate limitiation : Ben working on simulation will

Revision as of 12:24, 13 November 2020

  • Updates
    • HCAL
      • cosmics working on right side - checking cabling - still DMA transfer error
      • prescale set to 0 to get all the trigger - was set to 1 so was taking half
      • could try to swap FADC from bottom to top crate
      • try with bus analyzer ?
      • Bryan will check readout list
    • Bigbite Shower
      • PMTs replaced , starting taking data yesterday - will take data over week-end - and switch to CODA3 maybe Tuesday
    • INFN GEM
      • running cosmics on week-end with CODA3 - running stable - replacing cable trays and will retest - no need to power cycle low voltage - 3 M events run
    • UVA GEM
      • replaced one MPD which was giving read out errors - need to look at data - no errors seen with new MPD
    • BigBite GEM
      • set of 5 APV for testing in TEDF, crates and modules installed
    • Hodoscope
      • Mark gave HV write up, can control HV
      • next set of 16 almost ready
      • will setup TDC after switch to CODA3
    • CDet
      • still debugging few individual channels
      • Update on Wednesday - might need to reboot after - update in mounting /site , update should be done through puppet
    • LHRS
      • getting started with intel CPUs and new TI for LHRS
  • GEM DAQ rate limitiation : Ben working on simulation will