(Created page with "* Updates ** HCAL *** haven't tried new firmware yet *** data for silo ** Hodoscope *** one housing not well seated - unstacking and checking *** 32 bars stacked *** HV up and...") |
|||
Line 3: | Line 3: | ||
*** haven't tried new firmware yet | *** haven't tried new firmware yet | ||
*** data for silo | *** data for silo | ||
+ | *** different shapes for a PMT ? | ||
** Hodoscope | ** Hodoscope | ||
*** one housing not well seated - unstacking and checking | *** one housing not well seated - unstacking and checking | ||
Line 26: | Line 27: | ||
*** can start with FADC for unconnected channels - | *** can start with FADC for unconnected channels - | ||
*** get HCAL code to look at FADC data | *** get HCAL code to look at FADC data | ||
− | + | *** full waveform mode - for testing - production just time and amplitude | |
*Cables | *Cables | ||
** HCAL cables 100 m ( right now half 50 m ) | ** HCAL cables 100 m ( right now half 50 m ) | ||
+ | |||
+ | ** Location of repeaters for the NINO | ||
+ | ** need finalize low voltage for NINO location - not going - need longer LV cables - | ||
+ | ** in TEDF : 100 meters long cables - could use shorter cables |
Latest revision as of 13:13, 20 November 2020
- Updates
- HCAL
- haven't tried new firmware yet
- data for silo
- different shapes for a PMT ?
- Hodoscope
- one housing not well seated - unstacking and checking
- 32 bars stacked
- HV up and running, NINO supply hooked up
- switch to CODA 3 and have independent session for data taking
- INFN GEM
- still check with Paolo for issue
- backplane for UV chamber ? Paolo should help ? Need to check with Kondo and get start and finalize design
- INFN UVA : still
- BB GEM : all scripts installed CODA going - will test with APV
- CDet
- roped area around CDet - hot cryomodule in Test Lab - no impact so far on CDet - will
- finishing up modules - trouble shooting module - PMT might be misaligned - will fix next week - take data for efficiency and crosstalk
- cables : NINO - max length of 100 feet - 2 sets of cables - one to repeater and one from repeater to TDC - need to locate the cables Doug said he had them ( most likely BB VDC ribbon cables )
- sbs2 computer reboots by itself - at 5:30 pm Wednesday - need to check if glitch - will look at logs
- VETROC ordered
- Kara can work on VETROC setup
- can setup in clrlpc in new account for new session
- Shower
- took data
- cables for FADC
- can start with FADC for unconnected channels -
- get HCAL code to look at FADC data
- full waveform mode - for testing - production just time and amplitude
- HCAL
- Cables
- HCAL cables 100 m ( right now half 50 m )
- Location of repeaters for the NINO
- need finalize low voltage for NINO location - not going - need longer LV cables -
- in TEDF : 100 meters long cables - could use shorter cables