Difference between revisions of "SoLID Weekly : Monday, May.28, 2019 11:00am EDT"

From Hall A Wiki
Jump to: navigation, search
(Created page with "== Agenda == * Discussion on SoLID cost estimation according to WBS (Work Breakdown Structure) * Sub-system updates")
 
(Link to new wiki)
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
 +
This page has been moved to [https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_May.28,_2019_11:00am_EDT https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_May.28,_2019_11:00am_EDT] in the new [https://solid.jlab.org/wiki SoLID Wiki].  Please do not edit this page.
 +
 
== Agenda ==
 
== Agenda ==
 
* Discussion on SoLID cost estimation according to WBS (Work Breakdown
 
* Discussion on SoLID cost estimation according to WBS (Work Breakdown
 
Structure)
 
Structure)
 
* Sub-system updates
 
* Sub-system updates
 +
== Minutes ==
 +
 +
**JP: Thanks for every to get those cost estimation tables done last week. Except DAQ system from Alexandre, what's the slow control cost?
 +
**Alexandre: will add that part.
 +
**JP: We need the start and end time, and how long it takes for each item. We want to have enough information and documents for the cost direct review.  Possibly we will start on FY2023 (October 1, 2022).
 +
**Xiaochao: Need to define a better name for ECAL support.
 +
 +
==Present==
 +
Alexandre, JP, Ole, Paul, Nilanga, Michael, Robin, Whit, Xiaochao, Stephen, Jinglong, Ye, Rich, and Zhiwen

Latest revision as of 15:39, 7 December 2020

This page has been moved to https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_May.28,_2019_11:00am_EDT in the new SoLID Wiki. Please do not edit this page.

Agenda

  • Discussion on SoLID cost estimation according to WBS (Work Breakdown

Structure)

  • Sub-system updates

Minutes

    • JP: Thanks for every to get those cost estimation tables done last week. Except DAQ system from Alexandre, what's the slow control cost?
    • Alexandre: will add that part.
    • JP: We need the start and end time, and how long it takes for each item. We want to have enough information and documents for the cost direct review. Possibly we will start on FY2023 (October 1, 2022).
    • Xiaochao: Need to define a better name for ECAL support.

Present

Alexandre, JP, Ole, Paul, Nilanga, Michael, Robin, Whit, Xiaochao, Stephen, Jinglong, Ye, Rich, and Zhiwen