Difference between revisions of "Shift How-To"
From Hall A Wiki
(Created page with "= Overview = == Shift Roles == == Reporting and Logging == = Taking Data = == Starting the DAQ == == Monitoring the Data == = Recovery Procedures = = Systems = == Bea...") |
(→Taking Data) |
||
Line 7: | Line 7: | ||
= Taking Data = | = Taking Data = | ||
− | + | * Starting the DAQ | |
− | + | * Monitoring the Data | |
− | + | ||
= Recovery Procedures = | = Recovery Procedures = |
Revision as of 14:49, 8 June 2021
Contents
Overview
Shift Roles
Reporting and Logging
Taking Data
- Starting the DAQ
- Monitoring the Data
Recovery Procedures
Systems
Beam Line
- Hall A beam line drawing (to be updated)
- Checkout procedure
- spot++ (beam size verification)
- BPM calibration
- HARP scan
- Polarization Measurements
- Compton: Not Used
- Moller
Target
Magnets
- BigBite
- Super BigBite
- LHRS