Difference between revisions of "Shift How-To"
From Hall A Wiki
(→Taking Data) |
(→Taking Data) |
||
Line 7: | Line 7: | ||
= Taking Data = | = Taking Data = | ||
− | * | + | * Using the CODA DAQ |
− | * Monitoring the | + | ** GUI Description |
+ | ** Starting a Run | ||
+ | ** Stopping a Run | ||
+ | |||
+ | * Monitoring the data | ||
+ | * Online analysis | ||
+ | * Shift checklist | ||
= Recovery Procedures = | = Recovery Procedures = |
Revision as of 14:54, 8 June 2021
Contents
Overview
Shift Roles
Reporting and Logging
Taking Data
- Using the CODA DAQ
- GUI Description
- Starting a Run
- Stopping a Run
- Monitoring the data
- Online analysis
- Shift checklist
Recovery Procedures
Systems
Beam Line
- Hall A beam line drawing (to be updated)
- Checkout procedure
- spot++ (beam size verification)
- BPM calibration
- HARP scan
- Polarization Measurements
- Compton: Not Used
- Moller
Target
Magnets
- BigBite
- Super BigBite
- LHRS