Difference between revisions of "July 30th 2021"
From Hall A Wiki
Line 1: | Line 1: | ||
*On-going tasks | *On-going tasks | ||
− | + | **Network setup ( done ) | |
− | Network setup ( done ) | + | **Scaler crate setup (75 % - need put crate in / setup cpu ) |
− | Scaler crate setup (75 % - need put crate in / setup cpu ) | + | **3 rd GEM VXS crate install router moved up ( 75% ) |
− | 3 rd GEM VXS crate install router moved up ( 75% ) | + | **need power and network in GEM bunker |
− | need power and network in GEM bunker | + | **detector accounts setup |
− | detector accounts setup | + | **boot VME controllers (GRINCH Hodo Shower , 2GEM crate up ~60 % controller booted - Bryan setting up as in TEDF - need setup MPD new controllers) |
− | boot VME controllers (GRINCH Hodo Shower , 2GEM crate up ~60 % controller booted - Bryan setting up as in TEDF - need setup MPD new controllers) | + | **detector cabling |
− | detector cabling | + | **new MPD production - about to start - need to ship our FPGA to Paolo |
− | new MPD production - about to start - need to ship our FPGA to Paolo | + | **MPD VTP readout - on-going in daq lab - being setup in Hall A - need setup VTPs to boot |
− | MPD VTP readout - on-going in daq lab - being setup in Hall A - need setup VTPs to boot | + | **Bigbite - HCal trigger setup |
− | Bigbite - HCal trigger setup | + | **TS setup - 0% |
− | TS setup - 0% | + | **Beamline crate setup ( in scaler crate ) |
− | Beamline crate setup ( in scaler crate ) | + | **HCAL cabling |
− | HCAL cabling | + | **HCAL need power |
− | HCAL need power | + | **Mark hodoscope trigger ? |
− | Mark hodoscope trigger ? | + | **Computer move to Hall A : sbsdaq1/2 tedbbdaq enpcamsonne |
− | Computer move to Hall A : sbsdaq1/2 tedbbdaq enpcamsonne | + | *Outstanding issues |
− | Outstanding issues | + | **2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC |
− | 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC | + | **SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) |
− | SD delay : still need | + | **need to adjust for HCAL transit time with different PMTs |
− | need to adjust for HCAL transit time with different PMTs | + | **status of cosmics paddles |
− | status of cosmics paddles | + | **GEM fibers too short : 60 m ordered |
− | GEM fibers too short : | + | **15 bad MPDs |
− | + |
Revision as of 10:22, 30 July 2021
- On-going tasks
- Network setup ( done )
- Scaler crate setup (75 % - need put crate in / setup cpu )
- 3 rd GEM VXS crate install router moved up ( 75% )
- need power and network in GEM bunker
- detector accounts setup
- boot VME controllers (GRINCH Hodo Shower , 2GEM crate up ~60 % controller booted - Bryan setting up as in TEDF - need setup MPD new controllers)
- detector cabling
- new MPD production - about to start - need to ship our FPGA to Paolo
- MPD VTP readout - on-going in daq lab - being setup in Hall A - need setup VTPs to boot
- Bigbite - HCal trigger setup
- TS setup - 0%
- Beamline crate setup ( in scaler crate )
- HCAL cabling
- HCAL need power
- Mark hodoscope trigger ?
- Computer move to Hall A : sbsdaq1/2 tedbbdaq enpcamsonne
- Outstanding issues
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )
- need to adjust for HCAL transit time with different PMTs
- status of cosmics paddles
- GEM fibers too short : 60 m ordered
- 15 bad MPDs