Difference between revisions of "Octorber 29nd 2021"
From Hall A Wiki
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
**coincidence trigger | **coincidence trigger | ||
**Bigbite Shower | **Bigbite Shower | ||
+ | ***looking at preshower | ||
**Hodoscope | **Hodoscope | ||
+ | ***working on calibration | ||
+ | ***might need to adjust HV | ||
+ | ***FADC might be running at 40 MHZ - will get clock from other crate scaler - | ||
**GRINCH | **GRINCH | ||
+ | ***timing signal not showing up - seems decoder issue | ||
+ | ***Mark and Bradley check with EDTM signal : could see in scaler and raw data | ||
+ | ***windows was set to 1100 ns, widen and changed latency to 1200 so should see signal now | ||
**CDet | **CDet | ||
**GEM Bigbite INFN | **GEM Bigbite INFN | ||
Line 10: | Line 17: | ||
**GEM UVA clean room | **GEM UVA clean room | ||
**Helicity | **Helicity | ||
+ | ***working , working on decoder | ||
+ | ***new helicity board in TEDF setup | ||
**Beamline/scalers | **Beamline/scalers | ||
+ | ***Bob and David look at scaler data | ||
+ | ***u new , x3 and x 10 - pedestal exactly 0 - negative offset from receivers - checked with pulser everything working - need beam current scan | ||
+ | ***take one other signal and swap to check it shows up | ||
+ | Raster test: https://logbooks.jlab.org/entry/3928752 | ||
**HV | **HV | ||
Line 16: | Line 29: | ||
*On-going tasks | *On-going tasks | ||
**EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) - Provokar gave scripts for some variables to be added : HV for all detectors - issue with ET - Paul checking if there are scripts submitting event as Beginning Of Run event - might be reason for hang-ups | **EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) - Provokar gave scripts for some variables to be added : HV for all detectors - issue with ET - Paul checking if there are scripts submitting event as Beginning Of Run event - might be reason for hang-ups | ||
+ | see all events in data stream - | ||
+ | **David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Stevev | ||
**script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work | **script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work | ||
**sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) | **sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) | ||
**(90%) reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add | **(90%) reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add | ||
separate - need RC box for shower and hodo if possible | separate - need RC box for shower and hodo if possible | ||
− | **(new) Trigger latch TS to TDC ( | + | **(new) Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch |
− | **event type decoding in analyzer - ( mention at analysis meeting ) - need to check with Ole | + | **event type decoding in analyzer - ( mention at analysis meeting ) - need to check with Ole - decoding done and will get in the tree |
**MPD retiming with V1495 ( done ) - timestamp issue still need to be implemented - in datastream but might still have issues - can fix with firwmare update - can use TI timestamp to check with other - MPD timestamp not always reliable and misaligned at the start - might be best to test in EEL first - timestamp - event counter working - couple of hours - updating MPD, V1495 and readout list - might need 4 hours - can induce change in latency - | **MPD retiming with V1495 ( done ) - timestamp issue still need to be implemented - in datastream but might still have issues - can fix with firwmare update - can use TI timestamp to check with other - MPD timestamp not always reliable and misaligned at the start - might be best to test in EEL first - timestamp - event counter working - couple of hours - updating MPD, V1495 and readout list - might need 4 hours - can induce change in latency - | ||
**need to look at MPD timestamp make sure they all agree | **need to look at MPD timestamp make sure they all agree | ||
Line 29: | Line 44: | ||
****User event inserted at each split with timestamp, spectrometer information - should discuss with andre | ****User event inserted at each split with timestamp, spectrometer information - should discuss with andre | ||
****mysql database | ****mysql database | ||
− | ****autoanalysis at end of run - | + | ****autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine |
− | ****setup laptop for CH blujeans and Slack | + | ****setup laptop for CH blujeans and Slack - need fix hard drive |
****hodoscope calibration | ****hodoscope calibration | ||
****HCAL calibration | ****HCAL calibration | ||
Line 36: | Line 51: | ||
***setup on halladev ( done ) | ***setup on halladev ( done ) | ||
***setup VTP - Bryan working on setting computers and VTP - Ben will bring 2nd VTP | ***setup VTP - Bryan working on setting computers and VTP - Ben will bring 2nd VTP | ||
+ | ***both VTP running with triggers (Bryan ) can see MPD from QSFP transceiver, debugging fiber connection and try triggered data | ||
Line 42: | Line 58: | ||
**(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue | **(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue | ||
**HV can put documentation for other non EPICS control | **HV can put documentation for other non EPICS control | ||
− | **(50%) near limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? | + | **(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? |
**(new, sort of) HV hodoscope channels turning off | **(new, sort of) HV hodoscope channels turning off | ||
**(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation | **(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation | ||
Line 50: | Line 66: | ||
**(new) TDC errors - just one run though - https://logbooks.jlab.org/ent | **(new) TDC errors - just one run though - https://logbooks.jlab.org/ent | ||
ry/3923168**(new) sbsvtp1 not detecting MPD fiber | ry/3923168**(new) sbsvtp1 not detecting MPD fiber | ||
− | **(new)HCAL flag file crashing ROCs : file too long ? | + | **(new)HCAL flag file crashing ROCs : file too long ? - max file length to add - |
− | **(new) Raster saturation ( fixed with 20 db attenuator ) | + | **(new) Raster saturation ( fixed with 20 db attenuator ) |
− | **(New) No clear signal in GRINCH | + | **(New) No clear signal in GRINCH - latency was adjusted |
**HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people | **HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people | ||
+ | **(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul - | ||
+ | Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ? | ||
+ | |||
+ | *3820 scalers : issue to address - will get more as spare - and need |
Latest revision as of 11:11, 29 October 2021
- Updates
- HCal
- coincidence trigger
- Bigbite Shower
- looking at preshower
- Hodoscope
- working on calibration
- might need to adjust HV
- FADC might be running at 40 MHZ - will get clock from other crate scaler -
- GRINCH
- timing signal not showing up - seems decoder issue
- Mark and Bradley check with EDTM signal : could see in scaler and raw data
- windows was set to 1100 ns, widen and changed latency to 1200 so should see signal now
- CDet
- GEM Bigbite INFN
- GEM INFN clean room
- GEM UVA clean room
- Helicity
- working , working on decoder
- new helicity board in TEDF setup
- Beamline/scalers
- Bob and David look at scaler data
- u new , x3 and x 10 - pedestal exactly 0 - negative offset from receivers - checked with pulser everything working - need beam current scan
- take one other signal and swap to check it shows up
Raster test: https://logbooks.jlab.org/entry/3928752
- HV
- On-going tasks
- EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) - Provokar gave scripts for some variables to be added : HV for all detectors - issue with ET - Paul checking if there are scripts submitting event as Beginning Of Run event - might be reason for hang-ups
see all events in data stream -
- David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Stevev
- script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work
- sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%)
- (90%) reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add
separate - need RC box for shower and hodo if possible
- (new) Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch
- event type decoding in analyzer - ( mention at analysis meeting ) - need to check with Ole - decoding done and will get in the tree
- MPD retiming with V1495 ( done ) - timestamp issue still need to be implemented - in datastream but might still have issues - can fix with firwmare update - can use TI timestamp to check with other - MPD timestamp not always reliable and misaligned at the start - might be best to test in EEL first - timestamp - event counter working - couple of hours - updating MPD, V1495 and readout list - might need 4 hours - can induce change in latency -
- need to look at MPD timestamp make sure they all agree
- Possible new tasks
- rcdb
- check latency with DiagGui ( needs firmware and code work - low priority )
- User event inserted at each split with timestamp, spectrometer information - should discuss with andre
- mysql database
- autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine
- setup laptop for CH blujeans and Slack - need fix hard drive
- hodoscope calibration
- HCAL calibration
- Possible new tasks
- GEN RP
- setup on halladev ( done )
- setup VTP - Bryan working on setting computers and VTP - Ben will bring 2nd VTP
- both VTP running with triggers (Bryan ) can see MPD from QSFP transceiver, debugging fiber connection and try triggered data
- Unresolved issue
- (need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
- (still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
- HV can put documentation for other non EPICS control
- (50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ?
- (new, sort of) HV hodoscope channels turning off
- (cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
- (new) EPICS insertion : working better but still hangs for long runs
- (new) ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented
- (new) ER1 hangup - related to ET issue -
- (new) TDC errors - just one run though - https://logbooks.jlab.org/ent
ry/3923168**(new) sbsvtp1 not detecting MPD fiber
- (new)HCAL flag file crashing ROCs : file too long ? - max file length to add -
- (new) Raster saturation ( fixed with 20 db attenuator )
- (New) No clear signal in GRINCH - latency was adjusted
- HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people
- (new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -
Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?
- 3820 scalers : issue to address - will get more as spare - and need