Difference between revisions of "November 11th 2021"
From Hall A Wiki
(Created page with "*Updates **HCal **coincidence trigger **Bigbite Shower ***took cosmics ***took HV Scan during the night ***preshower has more hits on one side, maybe need to adjust HV ***ne...") |
|||
Line 3: | Line 3: | ||
**coincidence trigger | **coincidence trigger | ||
**Bigbite Shower | **Bigbite Shower | ||
− | |||
− | |||
− | |||
− | |||
**Hodoscope | **Hodoscope | ||
**GRINCH | **GRINCH | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
**CDet | **CDet | ||
− | |||
− | |||
**GEM Bigbite | **GEM Bigbite | ||
− | |||
− | |||
− | |||
**GEM INFN clean room | **GEM INFN clean room | ||
**Helicity | **Helicity | ||
**Beamline/scalers | **Beamline/scalers | ||
− | |||
− | |||
− | |||
− | |||
**HV | **HV | ||
− | |||
− | |||
*On-going tasks | *On-going tasks | ||
− | **EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) | + | **EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - |
**David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side ) | **David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side ) | ||
**script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work - | **script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work - | ||
**sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available | **sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available | ||
− | ** | + | **reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add |
separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark ) | separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark ) | ||
− | ** | + | **Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch |
− | **event type decoding in analyzer - ( mention at analysis meeting ) - need | + | **event type decoding in analyzer - ( mention at analysis meeting ) - need update CH analyzer |
***Possible new tasks | ***Possible new tasks | ||
****User event inserted at each split with timestamp, spectrometer information - should discuss with | ****User event inserted at each split with timestamp, spectrometer information - should discuss with | ||
Line 50: | Line 29: | ||
*Unresolved issue | *Unresolved issue | ||
− | **TI shower in William | + | **TI shower in William office (fixed) |
**(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal | **(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal | ||
**(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue | **(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue | ||
**HV can put documentation for other non EPICS control | **HV can put documentation for other non EPICS control | ||
− | **(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? | + | **(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now |
**(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation | **(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation | ||
** EPICS insertion : working better but still hangs for long runs | ** EPICS insertion : working better but still hangs for long runs | ||
− | ** ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset - | + | ** ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset - |
**(new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes | **(new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes | ||
**(new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168 | **(new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168 | ||
**(new)HCAL flag file crashing ROCs : file too long ? - max file length to add - | **(new)HCAL flag file crashing ROCs : file too long ? - max file length to add - | ||
**(fixed) Raster saturation ( fixed with 20 db attenuator ) - | **(fixed) Raster saturation ( fixed with 20 db attenuator ) - | ||
− | **No clear signal in GRINCH - latency was adjusted | + | **No clear signal in GRINCH - latency was adjusted - need check with beam |
**HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people | **HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people | ||
**(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul - | **(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul - |
Revision as of 11:17, 12 November 2021
- Updates
- HCal
- coincidence trigger
- Bigbite Shower
- Hodoscope
- GRINCH
- CDet
- GEM Bigbite
- GEM INFN clean room
- Helicity
- Beamline/scalers
- HV
- On-going tasks
- EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET -
- David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
- script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work -
- sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available
- reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add
separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark )
- Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch
- event type decoding in analyzer - ( mention at analysis meeting ) - need update CH analyzer
- Possible new tasks
- User event inserted at each split with timestamp, spectrometer information - should discuss with
- autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine
- setup laptop for CH blujeans and Slack - need fix hard drive
- Possible new tasks
- Unresolved issue
- TI shower in William office (fixed)
- (need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
- (still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
- HV can put documentation for other non EPICS control
- (50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
- (cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
- EPICS insertion : working better but still hangs for long runs
- ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset -
- (new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes
- (new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168
- (new)HCAL flag file crashing ROCs : file too long ? - max file length to add -
- (fixed) Raster saturation ( fixed with 20 db attenuator ) -
- No clear signal in GRINCH - latency was adjusted - need check with beam
- HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people
- (new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -
Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?
- 3820 scalers : issue to address - will get more as spare - and need
GEn RP
- GEN RP DAQ
- both VTP working
- debugging fiber connection
- will bring VME crate
- new MPD might arrive for Thanksgiving