(Created page with "*Updates **HCal **coincidence trigger **Bigbite Shower ***took cosmics ***took HV Scan during the night ***preshower has more hits on one side, maybe need to adjust HV ***ne...")
 
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
*Updates
 
*Updates
 
**HCal
 
**HCal
 +
***timing resolution ? Still need to check RF time
 
**coincidence trigger
 
**coincidence trigger
 
**Bigbite Shower
 
**Bigbite Shower
***took cosmics  
+
***could not see signal in Shower 17-3 - from last night cosmics
***took HV Scan during the night
+
***Preshower gain matching changed after magnet test
***preshower has more hits on one side, maybe need to adjust HV
+
***need to check eve
+
 
**Hodoscope
 
**Hodoscope
 +
***working on calibration : offset and timewalk done
 +
***500 k events - will redo with more statistics
 +
***timing resolution from 250 ps to 150 ps
 +
***working on HV gain curves
 +
***looking at FADC from cosmics : looks ok
 
**GRINCH
 
**GRINCH
***taking LED run, seeing signal
+
***
***might need to turned down HV
+
***signal at VETROC is inverted logic - can fix with firmware setting - signal
+
***pulser rate to 100 Hz
+
***need to check with power switch - information on wiki - LED on port 8 - chech and halog with Brad
+
***will take LED data with cosmics - prescaled
+
 
**CDet
 
**CDet
***issue with one PMT / bar, PMT works fine, might be because of electronics, will check with scope
+
***still working on the PMT10 with missing pixels - the paddles might not be separated - might treat them as one single channel
***might need to open detector if not electronics
+
 
**GEM Bigbite
 
**GEM Bigbite
***took cosmics data : ADC distribution look ok at low level
+
***everything looks good
***don't think need
+
***waiting for swap to UV GEM, UV GEM was tested
***did not see many tracks but might be d
+
 
**GEM INFN clean room
 
**GEM INFN clean room
 
**Helicity  
 
**Helicity  
 
**Beamline/scalers
 
**Beamline/scalers
***checked VtoF on Monday with 9 V battery, all look good
+
***no major updates
***NIM signals look ok
+
***still looking at LHRS scalers rate - working with other code and working on handling overflow
***negative offset on some channels
+
***gating of scalers : Steve working on it
***LHRS value look odd in replay, most likely due to clock - counts in tree
+
***still ET insertion failing after two splits
 +
***scalers inserted in event based
 +
***user events not working at end
 
**HV
 
**HV
***GEM floating HV, need CAEN HV crate - CNU has one crate with 6 slots - might need to to get more
 
 
  
 
*On-going tasks
 
*On-going tasks
**EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) - Provokar gave scripts for some variables to be added : HV for all detectors - issue with ET  - Paul checking if there are scripts submitting event as Beginning Of Run event - might be reason for hang-ups see all events in data stream - might update insertion library
+
**EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET  - could try run ER and EB on same node -
 
**David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
 
**David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
 
**script check MPD sync ( Ben , Andrew 20%) -  code to unpack information already written - need run with those data - timestamp need some work -  
 
**script check MPD sync ( Ben , Andrew 20%) -  code to unpack information already written - need run with those data - timestamp need some work -  
 
**sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available  
 
**sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available  
**(90%) reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add  
+
**reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add  
 
separate - need RC box for shower and hodo if possible  -  need to check - module will be added ( Mark )
 
separate - need RC box for shower and hodo if possible  -  need to check - module will be added ( Mark )
**(new) Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch  
+
**Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch  
**event type decoding in analyzer - ( mention at analysis meeting ) - need to check with Ole - decoding done and will get in the tree - need to check with data -
+
**event type decoding in analyzer - ( mention at analysis meeting ) - need update CH analyzer
 
***Possible new tasks
 
***Possible new tasks
 
****User event inserted at each split with timestamp, spectrometer information - should discuss with  
 
****User event inserted at each split with timestamp, spectrometer information - should discuss with  
 
****autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine
 
****autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine
 +
- still issues with non interactive shell - could try for next production
 
****setup laptop for CH blujeans and Slack - need fix hard drive
 
****setup laptop for CH blujeans and Slack - need fix hard drive
  
Line 50: Line 48:
  
 
*Unresolved issue
 
*Unresolved issue
**TI shower in William  
+
**Scaler gating ( need cable and go through TTL/ECL converter )
 +
**TI shower in William office (fixed)
 
**(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
 
**(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
 
**(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
 
**(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
 
**HV can put documentation for other non EPICS control
 
**HV can put documentation for other non EPICS control
**(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2  - HCal windows - could do 150 ns - Move FADCs to top crate ?  
+
**(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2  - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
 
**(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
 
**(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
 
** EPICS insertion : working better but still hangs for long runs
 
** EPICS insertion : working better but still hangs for long runs
** ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset -
+
** ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset -  
 
**(new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes
 
**(new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes
 
**(new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168
 
**(new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168
 
**(new)HCAL flag file crashing ROCs : file too long ? - max file length to add -  
 
**(new)HCAL flag file crashing ROCs : file too long ? - max file length to add -  
 
**(fixed) Raster saturation ( fixed with 20 db attenuator ) -  
 
**(fixed) Raster saturation ( fixed with 20 db attenuator ) -  
**No clear signal in GRINCH - latency was adjusted  
+
**No clear signal in GRINCH - latency was adjusted - need check with beam
**HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people
+
**HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people ( maybe empty channels - trigger info )
 
**(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -
 
**(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -
 
Logentry script:  https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?
 
Logentry script:  https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?
*3820 scalers : issue to address - will get more as spare - and need
+
*3820 scalers : issue to address - will get more as spare - and need -
 +
*tftp issue : VTP and
  
 
GEn RP
 
GEn RP
 
*GEN RP DAQ
 
*GEN RP DAQ
**both VTP working  
+
**both VTP working : 10 gigE link from VTP to computer
 +
**working on VTP update to handle more that 32 MPDs
 
**debugging fiber connection
 
**debugging fiber connection
 
**will bring VME crate
 
**will bring VME crate
**new MPD might arrive for Thanksgiving
+
**new MPD might arrive for Thanksgiving : 15 MPDs

Latest revision as of 12:08, 12 November 2021

  • Updates
    • HCal
      • timing resolution ? Still need to check RF time
    • coincidence trigger
    • Bigbite Shower
      • could not see signal in Shower 17-3 - from last night cosmics
      • Preshower gain matching changed after magnet test
    • Hodoscope
      • working on calibration : offset and timewalk done
      • 500 k events - will redo with more statistics
      • timing resolution from 250 ps to 150 ps
      • working on HV gain curves
      • looking at FADC from cosmics : looks ok
    • GRINCH
    • CDet
      • still working on the PMT10 with missing pixels - the paddles might not be separated - might treat them as one single channel
    • GEM Bigbite
      • everything looks good
      • waiting for swap to UV GEM, UV GEM was tested
    • GEM INFN clean room
    • Helicity
    • Beamline/scalers
      • no major updates
      • still looking at LHRS scalers rate - working with other code and working on handling overflow
      • gating of scalers : Steve working on it
      • still ET insertion failing after two splits
      • scalers inserted in event based
      • user events not working at end
    • HV
  • On-going tasks
    • EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - could try run ER and EB on same node -
    • David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
    • script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work -
    • sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available
    • reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add

separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark )

    • Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch
    • event type decoding in analyzer - ( mention at analysis meeting ) - need update CH analyzer
      • Possible new tasks
        • User event inserted at each split with timestamp, spectrometer information - should discuss with
        • autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine

- still issues with non interactive shell - could try for next production

        • setup laptop for CH blujeans and Slack - need fix hard drive


  • Unresolved issue
    • Scaler gating ( need cable and go through TTL/ECL converter )
    • TI shower in William office (fixed)
    • (need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
    • (still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
    • HV can put documentation for other non EPICS control
    • (50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
    • (cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
    • EPICS insertion : working better but still hangs for long runs
    • ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset -
    • (new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes
    • (new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168
    • (new)HCAL flag file crashing ROCs : file too long ? - max file length to add -
    • (fixed) Raster saturation ( fixed with 20 db attenuator ) -
    • No clear signal in GRINCH - latency was adjusted - need check with beam
    • HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people ( maybe empty channels - trigger info )
    • (new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -

Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?

  • 3820 scalers : issue to address - will get more as spare - and need -
  • tftp issue : VTP and

GEn RP

  • GEN RP DAQ
    • both VTP working : 10 gigE link from VTP to computer
    • working on VTP update to handle more that 32 MPDs
    • debugging fiber connection
    • will bring VME crate
    • new MPD might arrive for Thanksgiving : 15 MPDs