Difference between revisions of "November 11th 2021"
From Hall A Wiki
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
**HCal | **HCal | ||
+ | ***timing resolution ? Still need to check RF time | ||
**coincidence trigger | **coincidence trigger | ||
**Bigbite Shower | **Bigbite Shower | ||
+ | ***could not see signal in Shower 17-3 - from last night cosmics | ||
+ | ***Preshower gain matching changed after magnet test | ||
**Hodoscope | **Hodoscope | ||
+ | ***working on calibration : offset and timewalk done | ||
+ | ***500 k events - will redo with more statistics | ||
+ | ***timing resolution from 250 ps to 150 ps | ||
+ | ***working on HV gain curves | ||
+ | ***looking at FADC from cosmics : looks ok | ||
**GRINCH | **GRINCH | ||
+ | *** | ||
**CDet | **CDet | ||
+ | ***still working on the PMT10 with missing pixels - the paddles might not be separated - might treat them as one single channel | ||
**GEM Bigbite | **GEM Bigbite | ||
+ | ***everything looks good | ||
+ | ***waiting for swap to UV GEM, UV GEM was tested | ||
**GEM INFN clean room | **GEM INFN clean room | ||
**Helicity | **Helicity | ||
**Beamline/scalers | **Beamline/scalers | ||
+ | ***no major updates | ||
+ | ***still looking at LHRS scalers rate - working with other code and working on handling overflow | ||
+ | ***gating of scalers : Steve working on it | ||
+ | ***still ET insertion failing after two splits | ||
+ | ***scalers inserted in event based | ||
+ | ***user events not working at end | ||
**HV | **HV | ||
*On-going tasks | *On-going tasks | ||
− | **EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - | + | **EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - could try run ER and EB on same node - |
**David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side ) | **David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side ) | ||
**script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work - | **script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work - | ||
Line 24: | Line 42: | ||
****User event inserted at each split with timestamp, spectrometer information - should discuss with | ****User event inserted at each split with timestamp, spectrometer information - should discuss with | ||
****autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine | ****autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine | ||
+ | - still issues with non interactive shell - could try for next production | ||
****setup laptop for CH blujeans and Slack - need fix hard drive | ****setup laptop for CH blujeans and Slack - need fix hard drive | ||
Line 29: | Line 48: | ||
*Unresolved issue | *Unresolved issue | ||
+ | **Scaler gating ( need cable and go through TTL/ECL converter ) | ||
**TI shower in William office (fixed) | **TI shower in William office (fixed) | ||
**(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal | **(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal | ||
Line 42: | Line 62: | ||
**(fixed) Raster saturation ( fixed with 20 db attenuator ) - | **(fixed) Raster saturation ( fixed with 20 db attenuator ) - | ||
**No clear signal in GRINCH - latency was adjusted - need check with beam | **No clear signal in GRINCH - latency was adjusted - need check with beam | ||
− | **HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people | + | **HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people ( maybe empty channels - trigger info ) |
**(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul - | **(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul - | ||
Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ? | Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ? | ||
− | *3820 scalers : issue to address - will get more as spare - and need | + | *3820 scalers : issue to address - will get more as spare - and need - |
+ | *tftp issue : VTP and | ||
GEn RP | GEn RP | ||
*GEN RP DAQ | *GEN RP DAQ | ||
− | **both VTP working | + | **both VTP working : 10 gigE link from VTP to computer |
+ | **working on VTP update to handle more that 32 MPDs | ||
**debugging fiber connection | **debugging fiber connection | ||
**will bring VME crate | **will bring VME crate | ||
− | **new MPD might arrive for Thanksgiving | + | **new MPD might arrive for Thanksgiving : 15 MPDs |
Latest revision as of 12:08, 12 November 2021
- Updates
- HCal
- timing resolution ? Still need to check RF time
- coincidence trigger
- Bigbite Shower
- could not see signal in Shower 17-3 - from last night cosmics
- Preshower gain matching changed after magnet test
- Hodoscope
- working on calibration : offset and timewalk done
- 500 k events - will redo with more statistics
- timing resolution from 250 ps to 150 ps
- working on HV gain curves
- looking at FADC from cosmics : looks ok
- GRINCH
- CDet
- still working on the PMT10 with missing pixels - the paddles might not be separated - might treat them as one single channel
- GEM Bigbite
- everything looks good
- waiting for swap to UV GEM, UV GEM was tested
- GEM INFN clean room
- Helicity
- Beamline/scalers
- no major updates
- still looking at LHRS scalers rate - working with other code and working on handling overflow
- gating of scalers : Steve working on it
- still ET insertion failing after two splits
- scalers inserted in event based
- user events not working at end
- HV
- HCal
- On-going tasks
- EPICS / start End of run logging script (Bob 99% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - could try run ER and EB on same node -
- David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
- script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work -
- sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available
- reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add
separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark )
- Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch
- event type decoding in analyzer - ( mention at analysis meeting ) - need update CH analyzer
- Possible new tasks
- User event inserted at each split with timestamp, spectrometer information - should discuss with
- autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine
- Possible new tasks
- still issues with non interactive shell - could try for next production
- setup laptop for CH blujeans and Slack - need fix hard drive
- Unresolved issue
- Scaler gating ( need cable and go through TTL/ECL converter )
- TI shower in William office (fixed)
- (need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
- (still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
- HV can put documentation for other non EPICS control
- (50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
- (cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
- EPICS insertion : working better but still hangs for long runs
- ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset -
- (new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes
- (new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168
- (new)HCAL flag file crashing ROCs : file too long ? - max file length to add -
- (fixed) Raster saturation ( fixed with 20 db attenuator ) -
- No clear signal in GRINCH - latency was adjusted - need check with beam
- HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people ( maybe empty channels - trigger info )
- (new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -
Logentry script: https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?
- 3820 scalers : issue to address - will get more as spare - and need -
- tftp issue : VTP and
GEn RP
- GEN RP DAQ
- both VTP working : 10 gigE link from VTP to computer
- working on VTP update to handle more that 32 MPDs
- debugging fiber connection
- will bring VME crate
- new MPD might arrive for Thanksgiving : 15 MPDs