Difference between revisions of "Meeting 2021 11 24"
From Hall A Wiki
(Created page with "<span style="font-size:larger">'''GMn GEM commissioning Meetings: WEDNESDAY 10:00am - 11:00am'''</span> Link to all previous meetings: [https://hallaweb.jlab.org/wiki/index.p...") |
(→Update on UVa GEM layers for GEn-RP (Anu, John, Thir)) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 7: | Line 7: | ||
=== Update on BB GEMs(Sean, Ezekiel, Holly, Anu) === | === Update on BB GEMs(Sean, Ezekiel, Holly, Anu) === | ||
− | * | + | * GEM layer was swapped last Wednesday. |
+ | * Two APVs fixed on the GEM layer on Thursday. | ||
+ | * Resistor added to BB UV layer 2 on Wednesday. | ||
+ | * Plan to take HV scan on all three UV layers in BB. See [https://docs.google.com/spreadsheets/d/19jD5AEY7XemTJ8pL2gt7NlVbc49LKnNyNfLFP7bC6Lk/edit?usp=sharing spreadsheet] | ||
+ | * Anu will start working as the GEM expert on call for this week starting today evening. | ||
=== Update on UVa GEM layers for GEn-RP (Anu, John, Thir) === | === Update on UVa GEM layers for GEn-RP (Anu, John, Thir) === | ||
− | * | + | * Working on the GEM database for tracking analysis on GEn-RP cosmic setup in EEL/125 which will eventually be extended to for Hall setup. Yesterday we had a productive meeting with Andrew where he helped us to get things started. Will continue to work with him continuously until we are able to use his scripts for tracking. |
+ | * [https://docs.google.com/presentation/d/1gjy8icW6m9Q37BS3aEhNvhPTtXlZnc-qKiBs1Xe5hS8/edit#slide=id.p GEn-RP DAQ updates] | ||
=== Update on INFN GEM layers for GEn-RP (Ezekiel) === | === Update on INFN GEM layers for GEn-RP (Ezekiel) === | ||
− | * | + | * Resolving HV trouble on J1 top (seems due to shielding). APVs that are not well connected (id from [[Media:cluster_1028.pdf | cosmics]]) were repaired. |
+ | * Plan to take a longer HV run for the whole layer this week. | ||
+ | * Will need to repair a few APVs on J3. | ||
=== Update on the Tracking efficiency / resolution (Andrew) === | === Update on the Tracking efficiency / resolution (Andrew) === |
Latest revision as of 11:35, 24 November 2021
GMn GEM commissioning Meetings: WEDNESDAY 10:00am - 11:00am
Link to all previous meetings: GMn GEM Commissioning Meeting
Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!
Contents
Update on BB GEMs(Sean, Ezekiel, Holly, Anu)
- GEM layer was swapped last Wednesday.
- Two APVs fixed on the GEM layer on Thursday.
- Resistor added to BB UV layer 2 on Wednesday.
- Plan to take HV scan on all three UV layers in BB. See spreadsheet
- Anu will start working as the GEM expert on call for this week starting today evening.
Update on UVa GEM layers for GEn-RP (Anu, John, Thir)
- Working on the GEM database for tracking analysis on GEn-RP cosmic setup in EEL/125 which will eventually be extended to for Hall setup. Yesterday we had a productive meeting with Andrew where he helped us to get things started. Will continue to work with him continuously until we are able to use his scripts for tracking.
- GEn-RP DAQ updates
Update on INFN GEM layers for GEn-RP (Ezekiel)
- Resolving HV trouble on J1 top (seems due to shielding). APVs that are not well connected (id from cosmics) were repaired.
- Plan to take a longer HV run for the whole layer this week.
- Will need to repair a few APVs on J3.