(Discussion on personnel for supporting GEMs in upcoming SBS experiments (all))
(Update on BB GEMs(Sean, Ezekiel, Holly, Anu))
Line 17: Line 17:
  
 
===  Update on BB GEMs(Sean, Ezekiel, Holly, Anu) ===
 
===  Update on BB GEMs(Sean, Ezekiel, Holly, Anu) ===
* Analysis of negative pulse study (https://logbooks.jlab.org/entry/3979464) still underway
+
* This morning the BBCal threshold was increased to about 500 mV. Currently the excess currents on LD2 at a beam current of about 4.5-5 uAmp are reasonable and stable.
* Negative pulse analysis ideas
+
*Anu and Sean recently replaced an entire new backplane and APVs for the 3rd UV layer and this returns that active area so there are no missing APVs.
** The occupancy of the negative signals
+
*Currently there are no extra 3 and 4 slot backplanes. So production of more spares needs to be considered
** Timing distribution of the negative signals
+
** Fraction of negative signals to positive signals
+
** Fraction of negative signals to positive signals on the same event
+
** Fraction of negative signals to positive signals on the same event in the same APV
+
** Fraction of negative signals to positive signals on the same event in the same MPD
+
** Use tracking to see if negative signals correlate to the track position
+
** Check if hits turned a negative signal into a positive one
+
  
 
=== Update on UVa GEM layers for GEn-RP (Anu, John, Thir) ===
 
=== Update on UVa GEM layers for GEn-RP (Anu, John, Thir) ===

Revision as of 12:05, 2 February 2022

GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am

Link to all previous meetings: GMn GEM Commissioning Meeting

Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!


Discussion on personnel for supporting GEMs in upcoming SBS experiments (all)

  • From UVa, Anu and Sean will still be involved till Fall 2022 or early 2023. John B. will be involved through GEN-RP. 2 new students from Nilanga's group will be getting involved near beginning of the summer.
  • From Hampton, Manju and Saru will getting involved now and primarily focused on GEN-RP GEMs. Thir will also remained involved.
  • Zeke will still be involved during GEN and GEN-RP.
  • Holly will need to confirm, but I think she will be involved in the near future as well.
  • Currently it seems for near future activities and commissioning of GEN-RP GEMs in the Hall experience folks like Anu, Sean, John, Zeke will be involved to provide teaching and transition for new people from both UVa and Hampton.
  • New Hampton and UVa people have access to JLab, which is good.
  • There are discussions of constructing 4 new layers at UVa, so workforce will have to be considered for that as well.
  • Currently it is not clear what will run after GEN run period. Either SIDIS or GEP. Workforce should be reconsidered as that approaches.

Update on BB GEMs(Sean, Ezekiel, Holly, Anu)

  • This morning the BBCal threshold was increased to about 500 mV. Currently the excess currents on LD2 at a beam current of about 4.5-5 uAmp are reasonable and stable.
  • Anu and Sean recently replaced an entire new backplane and APVs for the 3rd UV layer and this returns that active area so there are no missing APVs.
  • Currently there are no extra 3 and 4 slot backplanes. So production of more spares needs to be considered

Update on UVa GEM layers for GEn-RP (Anu, John, Thir)

  • APV inventory
  • Updates on GEn-RP analyzer/replay

Update on INFN GEM layers for GEn-RP (Ezekiel, Holly, Evaristo)

DAQ updates (Ben, Bryan, Alex)