Difference between revisions of "February 25th 2022"

From Hall A Wiki
Jump to: navigation, search
 
Line 4: Line 4:
 
**ET/EPICS insertion : scaler / EPICS
 
**ET/EPICS insertion : scaler / EPICS
 
**timestamp from prestart
 
**timestamp from prestart
**analyzer support for multiple streams
+
**ET insertion : First event implementation
 +
**analyzer support for multiple streams : handling stream, and database and look on different disks
 
**High rate testing : BB VTP + BB GEM VTP
 
**High rate testing : BB VTP + BB GEM VTP
 +
**Helicity : setting up so helicity information is recorded in all streams, tell to ROL how many streams
 +
**need to check with software to handle several streams ( or at worse make a file with all events ) - need some thinking
 +
  
 
*Tasks for next run
 
*Tasks for next run
 +
**SBS GEM bunker fiber and network install
 
**VETROC in HCAL crate and split with F1
 
**VETROC in HCAL crate and split with F1
 
**HCAL digital trigger
 
**HCAL digital trigger
 
**Bigbite ECal digital trigger
 
**Bigbite ECal digital trigger
**SBS GEM bunker fiber and network install
+
**FADC VTP readout status ? Current firmware as only number of FADC that can stream through VTP - can stream 16 FADC to VTP - HCAL FADC and FADC firmware - need work - could implement FADC readout directly first - and work on HCAL trigger after
**HV rpi : adapt with newer Rpi and network boot and/or mount files system and prepare SD
+
 
 +
**HV rpi : adapt with newer Rpi and network boot and/or mount files system and prepare SD - Rpi1 vs new Rpi 2 3 ? Mode to talk to pins, need some adapt
 +
 
 +
*GEM latency improvement
 +
**Latency for each APV

Latest revision as of 12:06, 25 February 2022

  • Updates
  • Running with several event builders
    • ET/EPICS insertion : scaler / EPICS
    • timestamp from prestart
    • ET insertion : First event implementation
    • analyzer support for multiple streams : handling stream, and database and look on different disks
    • High rate testing : BB VTP + BB GEM VTP
    • Helicity : setting up so helicity information is recorded in all streams, tell to ROL how many streams
    • need to check with software to handle several streams ( or at worse make a file with all events ) - need some thinking


  • Tasks for next run
    • SBS GEM bunker fiber and network install
    • VETROC in HCAL crate and split with F1
    • HCAL digital trigger
    • Bigbite ECal digital trigger
    • FADC VTP readout status ? Current firmware as only number of FADC that can stream through VTP - can stream 16 FADC to VTP - HCAL FADC and FADC firmware - need work - could implement FADC readout directly first - and work on HCAL trigger after
    • HV rpi : adapt with newer Rpi and network boot and/or mount files system and prepare SD - Rpi1 vs new Rpi 2 3 ? Mode to talk to pins, need some adapt
  • GEM latency improvement
    • Latency for each APV