Difference between revisions of "May 4th 2022"

From Hall A Wiki
Jump to: navigation, search
(Created page with "*Updates *Discussion multiple streams ** testing DAQ setup https://logbooks.jlab.org/entry/3992794 **EPICS/scaler insertion **Helicity info insertion **software required cha...")
 
Line 1: Line 1:
 
*Updates
 
*Updates
 
+
**HCAL
 +
***Bryan booted the VTPs and working on readout list for VTP
 +
***Ben 10 gigE transceiver, Alexandre plugged the fibers to router
 +
***VTP library and initial readout list setup, few configurations files need to be updated, switch to add to the flash readout list, maybe test in a few days
 +
**Hodoscope
 +
***Glasgow people coming in summer
 +
***might still need to take data for ToT calibration with FADC
 +
**GEM
 +
***one layer taken out from BB, will replace HV parallel power supply
 +
***can other detector be turned on ? HV GEM off so can take cosmics
 +
**Shower : get ready to take cosmics again
 +
**made configuration without GEM with 2 and 3 event builders
  
 
*Discussion multiple streams
 
*Discussion multiple streams

Revision as of 09:13, 4 May 2022

  • Updates
    • HCAL
      • Bryan booted the VTPs and working on readout list for VTP
      • Ben 10 gigE transceiver, Alexandre plugged the fibers to router
      • VTP library and initial readout list setup, few configurations files need to be updated, switch to add to the flash readout list, maybe test in a few days
    • Hodoscope
      • Glasgow people coming in summer
      • might still need to take data for ToT calibration with FADC
    • GEM
      • one layer taken out from BB, will replace HV parallel power supply
      • can other detector be turned on ? HV GEM off so can take cosmics
    • Shower : get ready to take cosmics again
    • made configuration without GEM with 2 and 3 event builders