*Updates | *Updates | ||
− | ** | + | **HCAL |
+ | ***want to take overnight cosmics run | ||
+ | ***Sebastian modified scripts to look at data, need to look at data with cosmics | ||
+ | **Beamline | ||
+ | ***unser calibration was postponed, will check with Paul | ||
+ | ***GetCharge script on a-onl machine : seems to be working fine but need to try with a full run, need to check filename format for GEN | ||
+ | **GEM | ||
+ | ***BB GEM : taking cosmics data, 1 GEM module had lower effiency | ||
+ | ***BB parallel HV Volta integrated into EPICS : several channels for GEM, if one channel trips all channel trip | ||
+ | ***SBS side : low level test with APV, so far looks pretty good, might finish test today and will try take pedestal | ||
+ | ***still missing BNC cables for comics trigger, trigger and clock distribution cabling finished and working fine | ||
+ | ***ready to take data on eel124 computer, maybe late Wednesday afternoon, need to make sure there is a fiber between TI | ||
+ | ***need to add fiber to TS for SBS crate |
Latest revision as of 09:14, 3 August 2022
- Updates
- HCAL
- want to take overnight cosmics run
- Sebastian modified scripts to look at data, need to look at data with cosmics
- Beamline
- unser calibration was postponed, will check with Paul
- GetCharge script on a-onl machine : seems to be working fine but need to try with a full run, need to check filename format for GEN
- GEM
- BB GEM : taking cosmics data, 1 GEM module had lower effiency
- BB parallel HV Volta integrated into EPICS : several channels for GEM, if one channel trips all channel trip
- SBS side : low level test with APV, so far looks pretty good, might finish test today and will try take pedestal
- still missing BNC cables for comics trigger, trigger and clock distribution cabling finished and working fine
- ready to take data on eel124 computer, maybe late Wednesday afternoon, need to make sure there is a fiber between TI
- need to add fiber to TS for SBS crate
- HCAL