===  Near term work plan ===
 
===  Near term work plan ===
* All the fibers are connected both in the MPDs and the VTPs. We routed one extra, long, fiber cable as we found that a single long fiber cable supports only 48 MPDs and we currently have 50 MPDs for all the inline layers. Two fiber path panels were also ordered for the new long fiber cable.
+
* The second fiber patch panel and the fiber cable were installed
* Clock signal is available now in the SBS GEM bunker
+
* All the 3 VME MPD crates are on the network now and we are carrying out low level tests now.
* Power is supplied to the SBS GEM bunker via a transformer similar to BB GEMs - Jack
+
* Remote controlled power strips in the SBS GEM bunker are also online and working.
* Network cables were routed to all the network controlled devices in the SBS GEM bunker
+
* Alex is working on getting all the VME crates and power strips on to the network now. Once this step is completed, we will start the low level tests.
+
 
* SBS gas system - Jack
 
* SBS gas system - Jack
 
* Manpower for August
 
* Manpower for August
Line 31: Line 29:
 
* Gas shut-off valve configuration for outputs were changed as per the advice from Nilanga and Huong. Now we have two shut-off valves for the two separate outputs instead of T-ing the outputs and putting a single shut-off valve. This work is only partially completed as we had to order more shut-off valves for this. In the meantime, we disconnected the unfinished GEMs from the T connectors.
 
* Gas shut-off valve configuration for outputs were changed as per the advice from Nilanga and Huong. Now we have two shut-off valves for the two separate outputs instead of T-ing the outputs and putting a single shut-off valve. This work is only partially completed as we had to order more shut-off valves for this. In the meantime, we disconnected the unfinished GEMs from the T connectors.
 
* We successfully completed out very first HV test under Nitrogen in Hall! See the log entry: [https://logbooks.jlab.org/entry/4019873 SBS Inline UVA GEM first HV test under nitrogen in the Hall]
 
* We successfully completed out very first HV test under Nitrogen in Hall! See the log entry: [https://logbooks.jlab.org/entry/4019873 SBS Inline UVA GEM first HV test under nitrogen in the Hall]
 +
* Majority of the cable connections/clock phase are fine for the 6 UVA layers. We still have to re-test a few MPDs/APVs today and hopefully we will be done within today itself.
 +
* What's left after that will be take pedestal data.
  
 
===  Update on BB GEMs ===
 
===  Update on BB GEMs ===
* Gas flowing fine now, https://logbooks.jlab.org/entry/4019525
+
* All BB HV now immediately shuts off if the gas mixture is out of an acceptable range.
** Setting up automatic HV turn off if the gas ratio is incorrect.
+
* HiVolta supply channels are all forced to be on or off together.
* [https://hallaweb.jlab.org/wiki/images/8/8c/GEN_Production_Rates.pdf GEN BB production rates]
+
* [https://hallaweb.jlab.org/wiki/images/4/44/BB_XY_Layer_Issue_8_2_22.pdf BB XY layer investigation]
  
 
=== DAQ updates (Ben, Bryan, Alex) ===
 
=== DAQ updates (Ben, Bryan, Alex) ===

Latest revision as of 10:22, 3 August 2022

GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am

Link to all previous meetings: GMn GEM Commissioning Meeting

Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!


Near term work plan

  • The second fiber patch panel and the fiber cable were installed
  • All the 3 VME MPD crates are on the network now and we are carrying out low level tests now.
  • Remote controlled power strips in the SBS GEM bunker are also online and working.
  • SBS gas system - Jack
  • Manpower for August


Update on INFN GEM layers for GEn-RP

  • Ran up a new divider on the front layer GEM of the inline stack. Verified temperature and V/I consistent with divider run-up with no GEM.
  • Currently in Hall. Plan to install new dividers on upstream-most layer while we can easily access. Will need sliding platform to remove the layer to install the new dividers on the second layer.

Update on UVa GEM layers for GEn-RP

  • Gas shut-off valve configuration for outputs were changed as per the advice from Nilanga and Huong. Now we have two shut-off valves for the two separate outputs instead of T-ing the outputs and putting a single shut-off valve. This work is only partially completed as we had to order more shut-off valves for this. In the meantime, we disconnected the unfinished GEMs from the T connectors.
  • We successfully completed out very first HV test under Nitrogen in Hall! See the log entry: SBS Inline UVA GEM first HV test under nitrogen in the Hall
  • Majority of the cable connections/clock phase are fine for the 6 UVA layers. We still have to re-test a few MPDs/APVs today and hopefully we will be done within today itself.
  • What's left after that will be take pedestal data.

Update on BB GEMs

  • All BB HV now immediately shuts off if the gas mixture is out of an acceptable range.
  • HiVolta supply channels are all forced to be on or off together.
  • BB XY layer investigation

DAQ updates (Ben, Bryan, Alex)