Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
| 8:50  ||    '''Charge Item 1''': Design report (non-target) including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-1.pdf '''pdf'''])  ||      Robin Wines (20+10)       
 
| 8:50  ||    '''Charge Item 1''': Design report (non-target) including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-1.pdf '''pdf'''])  ||      Robin Wines (20+10)       
 
   |-
 
   |-
| 9:20  ||      '''Charge Items 2, 3''': SBS spectrometer, simulation of the proton polarimeter '''pdf''']) ||  Andrew Puckett (40+20)
+
| 9:20  ||      '''Charge Items 2, 3''': SBS spectrometer, simulation of the proton polarimeter '''pdf'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-2.pdf '''pdf''']) ||  Andrew Puckett (40+20)
 
|-
 
|-
 
|10:20  ||    '''Break'''  ||      (15)  
 
|10:20  ||    '''Break'''  ||      (15)  

Revision as of 11:33, 2 March 2023

Experimental Readiness Review 2023

  • Date: April 2023 (xx/yy)
  • Location: L102
  • ERR Committee
  • ERR Charge (pdf)
  • Proposal ([1])
  • Proposal Update ([2])


Agenda

Day 1 Morning
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Reviewer#1 (10)
8:30 Experiment Overview (pdf) Bogdan Wojtsekhowski (10+10)
8:50 Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors (ppt , pdf) Robin Wines (20+10)
9:20 Charge Items 2, 3: SBS spectrometer, simulation of the proton polarimeter pdf] , pdf) Andrew Puckett (40+20)
10:20 Break (15)
10:35 Charge Item 2: ECAL calorimeter (ppt , pdf) Donald Jones (20+10)
11:05 Charge Item 3: DAQ for ECAL pdf]) Robert Michaels (20+10)
13:30 Charge Item 5: Cryogenic target pdf]) Dave Meekins (20+10)
12:15 Lunch (45)
Afternoon Session
13:00 Charge Items 1, 2, 4: Equipment ownership, maintenance, control. Installation plans, timeline (pdf) Jessie Butler (20+10)
13:30 Charge Item 5: Coordinate Detector pdf]) Peter Monahan (20+10)
13:30 Charge Item 5: Hadron calorimeter pdf]) Jiwan (20+10)
13-45 Charge Item 5: SBS GEM chambers pdf]) Nilanga Liyanage (20+10)
13:30 Charge Item 5: GEM DAQ and Triggerpdf]) Ben Raydo (20+10)
14:00 Charge Item 6: Radiation and Shielding (pdf) Eric Fuchey (20+10)
14:30 Charge Item 7: Beam Commissioning plan pdf]) Bogdan Wojtsekhowski (20+10)
15:00 Charge Item 4: Personpower and responsibilities pdf]) Mark Jones (20+10)
15:30 Charge Item 8: Safety Documents, target Evaristo Cisbani (15+5)
15:50 Break (10)
16:00 Closed Session (90)
17:30 Closeout


Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD PLACEHOLDER, GEn VERSION NEEDED
Input for RSAD from Radcon (radiation budget form) (pdf)
Draft of LOSP for pol3He target (pdf)
Draft of OSP for pol3He target (pdf)
Draft of OSP for GEM detectors (pdf)
Draft of OSP for BigBite magnet (pdf)
Draft of OSP for BigBite rotation (pdf)
Draft of OSP GRINCH Cherenkov detector (pdf)
Draft of OSP for BigBite timing hodoscope (pdf)
Draft of OSP for Hadron Calorimeter, HCal-J (pdf)
Draft of OSP for Coordinate Detector, CDet (pdf)