Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 72: Line 72:
 
|-
 
|-
 
| ||      Input for RSAD from Radcon (radiation budget form) ([https://hallaweb.jlab.org/wiki/images/d/de/E12-09-016.pdf pdf]) ||  
 
| ||      Input for RSAD from Radcon (radiation budget form) ([https://hallaweb.jlab.org/wiki/images/d/de/E12-09-016.pdf pdf]) ||  
|-
 
| ||    Draft of LOSP for pol3He target ([https://hallaweb.jlab.org/wiki/images/4/40/LOSP_Pol3He_HallC_LaserRrom_v3.pdf pdf])  ||
 
|-
 
| ||    Draft of OSP for pol3He target ([https://hallaweb.jlab.org/wiki/images/2/21/OSP_polhe3_hallc_2019Nov7.pdf pdf])  ||
 
|-
 
| ||    Draft of OSP for GEM detectors ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn_GEM_OSP.pdf pdf])  ||
 
|-
 
| ||    Draft of OSP for BigBite magnet ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/BigBite_magnet_OSP.pdf pdf])  ||
 
|-
 
| ||    Draft of OSP for BigBite rotation ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/BigBite_rotation_OSP.pdf pdf])  ||
 
|-
 
| ||    Draft of OSP GRINCH Cherenkov detector ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GRINCH_OSP.pdf pdf])  ||
 
|-
 
| ||    Draft of OSP for BigBite timing hodoscope ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/BB_Hodo_OSP.pdf pdf])  ||
 
 
|-
 
|-
 
| ||    Draft of OSP for Hadron Calorimeter, HCal-J ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCal_OSP.pdf pdf])  ||  
 
| ||    Draft of OSP for Hadron Calorimeter, HCal-J ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCal_OSP.pdf pdf])  ||  

Revision as of 11:55, 2 March 2023

Experimental Readiness Review 2023

  • Date: April 2023 (xx/yy)
  • Location: L102
  • ERR Committee
  • ERR Charge (pdf)
  • Proposal ([1])
  • Proposal Update ([2])


Agenda

Day 1 Morning
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Chair (10)
8:30 Experiment Overview (pdf) Bogdan Wojtsekhowski (10+10)
8:50 Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors (ppt , pdf) Robin Wines (20+10)
9:20 Charge Items 2, 3: SBS spectrometer, simulation of the proton polarimeter pdf] , pdf) Andrew Puckett (40+20)
10:20 Break (15)
10:35 Charge Item 2: ECAL calorimeter (ppt , pdf) Donald Jones (20+10)
11:05 Charge Item 3: DAQ for ECAL pdf]) Robert Michaels (20+10)
13:30 Charge Item 5: Cryogenic target pdf]) Dave Meekins (20+10)
12:15 Lunch (45)
Afternoon Session
13:00 Charge Items 1, 2, 4: Equipment ownership, maintenance, control. Installation plans, timeline (pdf) Jessie Butler (20+10)
13:30 Charge Item 5: Coordinate Detector pdf]) Peter Monahan (20+10)
13:30 Charge Item 5: Hadron calorimeter pdf]) Jiwan Poudel (20+10)
13-45 Charge Item 5: SBS GEM chambers pdf]) Nilanga Liyanage (20+10)
13:30 Charge Item 5: GEM DAQ and Trigger pdf]) Ben Raydo (20+10)
14:00 Charge Item 6: Radiation and Shielding (pdf) Eric Fuchey (20+10)
14:30 Charge Item 7: Beam Commissioning plan and polarimetry pdf]) Donal Jones (20+10)
15:00 Charge Item 4: Personpower and responsibilities pdf]) Mark Jones (20+10)
15:30 Charge Item 8: Safety Documents, target Evaristo Cisbani (15+5)
15:50 Break (10)
16:00 Closed Session (90)
17:30 Closeout


Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD PLACEHOLDER, GEn VERSION NEEDED
Input for RSAD from Radcon (radiation budget form) (pdf)
Draft of OSP for Hadron Calorimeter, HCal-J (pdf)
Draft of OSP for Coordinate Detector, CDet (pdf)