Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 39: Line 39:
 
|-
 
|-
 
|'''Afternoon Session'''
 
|'''Afternoon Session'''
 +
|-
 
|13:00  ||      '''Charge Items 2, 3''': SBS spectrometer, simulation of the proton polarimeter '''pdf'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-2.pdf '''pdf''']) ||  Andrew Puckett (20+10)
 
|13:00  ||      '''Charge Items 2, 3''': SBS spectrometer, simulation of the proton polarimeter '''pdf'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-2.pdf '''pdf''']) ||  Andrew Puckett (20+10)
 
|-
 
|-

Revision as of 15:11, 2 March 2023

Experimental Readiness Review 2023

  • Date: April 2023 (xx/yy)
  • Location: L102
  • ERR Committee
  • ERR Charge (pdf)
  • Proposal ([1])
  • Proposal Update ([2])


Agenda

Day 1 Morning
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Chair (10)
8:30 Experiment Overview (pdf) BogdanW (10+10)
8:50 Charge Item 4: Personpower and responsibilities pdf]) Mark Jones (10+10)
9:10 Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors (ppt , pdf) Robin Wines (20+10)
9:40 Charge Item 5: Cryogenic target pdf]) Dave Meekins (10+10)
10:00 Charge Item 8: Safety Documents for GEp Evaristo Cisbani (15+5)
10:20 Break (20)
10:40 Charge Item 5: SBS GEM tacker pdf]) Nilanga Liyanage (20+10)
11:10 Charge Item 5: Hadron calorimeter pdf]) Jiwan Poudel (10+10)
11:30 Charge Item 5: SBS DAQ pdf]) Alex Camsonne(20+10)
12:00 Lunch (60)
Afternoon Session
13:00 Charge Items 2, 3: SBS spectrometer, simulation of the proton polarimeter pdf] , pdf) Andrew Puckett (20+10)
13:30 Charge Item 2: ECAL calorimeter (ppt , pdf) Donald Jones (20+10)
14:00 Charge Item 3: DAQ for ECAL pdf]) Robert Michaels (20+10)
14:30 Charge Item 5: Coordinate Detector pdf]) Peter Monahan (20+10)
15:00 Charge Item 5: GEM DAQ and Trigger pdf]) Ben Raydo (20+10)
15:30 Charge Item 5: Cryogenic target pdf]) Dave Meekins (15+5)
15:50 Break (20)
16:10 Charge Items 1, 2, 4: Equipment ownership, maintenance, control. Installation plans, timeline (pdf) Jessie Butler (20+10)
16:40 Charge Item 7: Beam Commissioning plan and polarimetry pdf]) Donal Jones (15+5)
17:10 Closed Session (90)
17:40 Closeout


Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD PLACEHOLDER, GEn VERSION NEEDED
Input for RSAD from Radcon (radiation budget form) (pdf)
Draft of OSP for Hadron Calorimeter, HCal-J (pdf)
Draft of OSP for Coordinate Detector, CDet (pdf)