Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 17: Line 17:
 
| 8:20  ||      Remarks from Chair and Charge      ||            Chair  (10)
 
| 8:20  ||      Remarks from Chair and Charge      ||            Chair  (10)
 
|-  
 
|-  
| 8:30  ||    '''Charge item 1''': ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf'''])      ||        BogdanW (10+10)
+
| 8:30  ||    '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf'''])      ||        BogdanW (10+10)
 
|-
 
|-
 
|13:00  ||      '''Charge Items 2''': SBS spectrometer, simulation of the polarimeter '''pdf'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-2.pdf '''pdf''']) ||  Andrew Puckett (20+10)
 
|13:00  ||      '''Charge Items 2''': SBS spectrometer, simulation of the polarimeter '''pdf'''] , [https://hallaweb.jlab.org/wiki/images/8/86/GEp_ERR-2.pdf '''pdf''']) ||  Andrew Puckett (20+10)

Revision as of 14:48, 28 March 2023

Experimental Readiness Review 2023

  • Date: April 24 2023 (Monday)
  • Location: L102
  • ERR Committee
  • ERR Charge (pdf)
  • GEp Proposal ([1])
  • GEp Proposal Update ([2])

Agenda

Day 1 Morning
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Chair (10)
8:30 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+10)
13:00 Charge Items 2: SBS spectrometer, simulation of the polarimeter pdf] , pdf) Andrew Puckett (20+10)
8:50 Charge Item 3: Person power and responsibilities pdf]) Mark Jones (10+10)
15:50 Charge Items 4: Equipment ownership, maintenance, control. Installation plans, timeline (pdf) Jessie Butler (30+10)
8:50 Charge Item 5: The simulation and data analysis software status pdf]) Mark Jones (10+10)
9:10 Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors (ppt) Robin Wines (20+10)
9:40 Charge Item 1a: Cryogenic target pdf]) S. Covrig Dusa (10+10)
10:20 Break (20)
10:40 Charge Item 1b: SBS GEM tacker pdf]). Nilanga Liyanage, Holly Szumila-Vance (20+10)
11:10 Charge Item 1c: Hadron calorimeter pdf]). Jiwan Poudel (10+10)
13:30 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+10)
11:30 Charge Item 1f: SBS DAQ pdf]) Alex Camsonne(20+10)
12:00 Lunch (60)
Afternoon Session
14:30 Charge Item 1e: Coordinate Detector pdf]) Peter Monahan (20+10)
15:00 Charge Item 1f: DAQ Trigger pdf]) Ben Raydo, Robert Michaels (20+10)
15:30 Break (20)
16:30 Charge Item 7: Beam Commissioning plan and polarimetry pdf]) Donal Jones (15+5)
10:00 Charge Item 6, 8: Safety Documents for GEp Evaristo Cisbani (15+5)
16:50 Closed Session (40)
17:30 Closeout
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
Input for RSAD from Radcon (radiation budget form) (pdf)
OSP for Hadron Calorimeter, HCal-J (pdf)
OSP for Coordinate Detector, CDet (pdf)
OSP for GEM detectors (pdf)