Difference between revisions of "ERR"
From Hall A Wiki
(→Agenda) |
(→Agenda) |
||
Line 29: | Line 29: | ||
|10:40 || '''Charge Item 5''': The simulation and data analysis software status for the experiment '''pdf''']) || Mark Jones (10+10) | |10:40 || '''Charge Item 5''': The simulation and data analysis software status for the experiment '''pdf''']) || Mark Jones (10+10) | ||
|- | |- | ||
− | |11:00 || '''Charge Item 1''': Design report | + | |11:00 || '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt''']) || Robin Wines (20+10) |
|- | |- | ||
|11:30 || '''Charge Item 1a''': Cryogenic target '''pdf''']) || S. Covrig Dusa (10+10) | |11:30 || '''Charge Item 1a''': Cryogenic target '''pdf''']) || S. Covrig Dusa (10+10) |
Revision as of 08:25, 29 March 2023
Experimental Readiness Review 2023
- Date: April 24 2023 (Monday)
- Location: L102
- ERR Committee
Agenda
Day 1 Morning | |||
8:00 | Closed Session | (20) | |
8:20 | Remarks from Chair and Charge | Chair (10) | |
8:30 | Charge item 1: The status of the equipment required for this experiment (pdf) | BogdanW (10+10) | |
8:50 | Charge Items 2 and 1c: SBS spectrometer, simulation of the polarimeter pdf] , pdf) | Andrew Puckett (20+10) | |
9:20 | Charge Item 3: The responsibilities, manpower and other resources pdf]) | Mark Jones (10+10) | |
9:40 | Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) | Jessie Butler (30+10) | |
10:20 | Break | (20) | |
10:40 | Charge Item 5: The simulation and data analysis software status for the experiment pdf]) | Mark Jones (10+10) | |
11:00 | Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) | Robin Wines (20+10) | |
11:30 | Charge Item 1a: Cryogenic target pdf]) | S. Covrig Dusa (10+10) | |
11:50 | Charge Item 1b: SBS GEM tacker pdf]). | Nilanga Liyanage, Holly Szumila-Vance (20+10) | |
12:20 | Lunch | (70) | Afternoon Session |
13:30 | Charge Item 1d: ECAL calorimeter (ppt) | Donald Jones (20+10) | |
14:00 | Charge Item 1e: Coordinate Detector pdf]) | Peter Monahan (20+10) | |
14:30 | Charge Item 1f: SBS DAQ pdf]) | Alex Camsonne(20+10) | |
15:00 | Charge Item 1f: DAQ Trigger pdf]) | Ben Raydo, Robert Michaels (20+10) | |
15:30 | Break | (20) | |
15:50 | Charge Item 7: Beam Commissioning plan and polarimetry pdf]) | W. Henry (20+10) | |
16:20 | Charge Item 6, 8: Safety Documents for GEp | Evaristo Cisbani (20+10) | |
16:50 | Closed Session | (40) | |
17:30 | Closeout | ||
Draft of COO (pdf) | |||
Draft of ERG (pdf) and chart (pdf) | |||
Draft of ESAD (pdf) | |||
Input for RSAD from Radcon (radiation budget form) (pdf) | |||
OSP for Hadron Calorimeter, HCal-J (pdf) | |||
OSP for Coordinate Detector, CDet (pdf) | |||
OSP for GEM detectors (pdf) |