Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(More details on Content of the talks)
(More details on Content of the talks)
Line 74: Line 74:
  
 
|-  
 
|-  
| 8:30  ||    '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf'''])     ||        BogdanW (10+10)
+
| 8:30  ||    '''Charge item 1''': The status of the equipment required for this experiment      ||        BogdanW (10+10)
 
|-
 
|-
| 8:50  ||    '''Charge Items 1b, 2a''': SBS GEM tracker (['''pdf''']).                                                                                                        ||  Nilanga Liyanage, Holly Szumila-Vance  (20+10)     
+
| 8:50  ||    '''Charge Items 1b, 2a''': SBS GEM tracker                                                                                                       ||  Nilanga Liyanage, Holly Szumila-Vance  (20+10)     
 
|-
 
|-
| 9:20  ||    '''Charge Items 1c, 2b, and 5''': The simulation and data analysis software status for the experiment (['''pdf'''])     ||    Andrew Puckett (20+10)   
+
| 9:20  ||    '''Charge Items 1c, 2b, and 5''': The simulation and data analysis software status for the experiment      ||    Andrew Puckett (20+10)   
 
|-
 
|-
| 9:50  ||    '''Charge Item 3''': The responsibilities, manpower and other resources (['''pdf'''])                                                     ||    Mark Jones (10+10)       
+
| 9:50  ||    '''Charge Item 3''': The responsibilities, manpower and other resources                                                      ||    Mark Jones (10+10)       
 
|-
 
|-
|10:30  ||    '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations ([https://hallaweb.jlab.org/wiki/images/7/79/ERR_-_SBS_GEp_Installation.pdf '''pdf'''])                                                                                              ||     Jessie Butler (20+10)         
+
|10:30  ||    '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations   ||   Jessie Butler (20+10)         
 
|-
 
|-
|11:00  ||    '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt'''])                                        ||      Robin Wines (20+10)
+
|11:00  ||    '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors                                         ||      Robin Wines (20+10)
 
|-
 
|-
|11:30  ||    '''Charge Item 1a''': Target and scattering chamber configuration (['''pdf'''])      || S. Covrig Dusa (10+10)
+
|11:30  ||    '''Charge Item 1a''': Target and scattering chamber configuration         || S. Covrig Dusa (10+10)
 
|-
 
|-
|13:00  ||    '''Charge Item 1d''': ECAL calorimeter ([https://hallaweb.jlab.org/wiki/index.php/File:GEp_ECAL.pptx '''ppt'''])  ||  Donald Jones (20+10)       
+
|13:00  ||    '''Charge Item 1d''': ECAL calorimeter   ||  Donald Jones (20+10)       
 
|-
 
|-
|13:30  ||    '''Charge Item 1e''': Coordinate Detector (['''pdf''']) ||    Peter Monahan (20+10)
+
|13:30  ||    '''Charge Item 1e''': Coordinate Detector ||    Peter Monahan (20+10)
 
|-
 
|-
|14:00  ||    '''Charge Item 1f and 5''': GEp experiment DAQ (['''pdf'''])                  ||    Alex Camsonne(20+10)  
+
|14:00  ||    '''Charge Item 1f and 5''': GEp experiment DAQ                   ||    Alex Camsonne(20+10)  
 
|-
 
|-
 
|14:30  ||    '''Charge Item 1f''': Trigger based on fADC (['''pdf''']) ||  Ben Raydo  (20+10)   
 
|14:30  ||    '''Charge Item 1f''': Trigger based on fADC (['''pdf''']) ||  Ben Raydo  (20+10)   

Revision as of 18:06, 31 March 2023

Experimental Readiness Review 2023

  • Date: April 24 2023 (Monday)
  • Location: L102
  • ERR Committee
  • ERR Charge ([1])
  • GEp Proposal ([2])
  • GEp Proposal Update ([3])

Agenda

Morning Session
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Chair (10)
8:30 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+10)
8:50 Charge Items 1b, 2a: SBS GEM tracker ([pdf]). Nilanga Liyanage, Holly Szumila-Vance (20+10)
9:20 Charge Items 1c, 2b, and 5: The simulation and data analysis software status for the experiment ([pdf]) Andrew Puckett (20+10)
9:50 Charge Item 3: The responsibilities, manpower and other resources ([pdf]) Mark Jones (10+10)
10:10 Break (20)
10:30 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) Jessie Butler (20+10)
11:00 Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) Robin Wines (20+10)
11:30 Charge Item 1a: Target and scattering chamber configuration ([pdf]) S. Covrig Dusa (10+10)
11:50 Lunch (70)
Afternoon Session
13:00 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+10)
13:30 Charge Item 1e: Coordinate Detector ([pdf]) Peter Monahan (20+10)
14:00 Charge Item 1f and 5: GEp experiment DAQ ([pdf]) Alex Camsonne(20+10)
14:30 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (20+10)
15:30 Break (20)
15:50 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (20+10)
16:20 Charge Item 7, 9: Safety Documents for GEp ([pdf]) Evaristo Cisbani (20+10)
16:50 Closed Session (40)
17:30 Closeout
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
Input for RSAD from Radcon (radiation budget form) (pdf)
OSP for Hadron Calorimeter, HCal-J (pdf)
OSP for Coordinate Detector, CDet (pdf)
OSP for GEM detectors (pdf)

More details on Content of the talks

8:30 Charge item 1: The status of the equipment required for this experiment BogdanW (10+10)
8:50 Charge Items 1b, 2a: SBS GEM tracker Nilanga Liyanage, Holly Szumila-Vance (20+10)
9:20 Charge Items 1c, 2b, and 5: The simulation and data analysis software status for the experiment Andrew Puckett (20+10)
9:50 Charge Item 3: The responsibilities, manpower and other resources Mark Jones (10+10)
10:30 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations Jessie Butler (20+10)
11:00 Charge Item 1: Design report including modifications to beamline, SBS and detectors Robin Wines (20+10)
11:30 Charge Item 1a: Target and scattering chamber configuration S. Covrig Dusa (10+10)
13:00 Charge Item 1d: ECAL calorimeter Donald Jones (20+10)
13:30 Charge Item 1e: Coordinate Detector Peter Monahan (20+10)
14:00 Charge Item 1f and 5: GEp experiment DAQ Alex Camsonne(20+10)
14:30 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (20+10)
15:50 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (20+10)
16:20 Charge Item 7, 9: Safety Documents for GEp ([pdf]) Evaristo Cisbani (20+10)