Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(More details on Content of the talks)
(More details on Content of the talks)
Line 74: Line 74:
  
 
|-  
 
|-  
| 8:30  ||    '''Charge item 1''': The status of the equipment required for this experiment      ||        BogdanW (10+10)
+
| 8:30  ||    '''Charge item 1''': Concept of experiment, close to PAC update     ||        BogdanW  
 
|-
 
|-
| 8:50  ||    '''Charge Items 1b, 2a''': SBS GEM tracker                                                                                                       ||  Nilanga Liyanage, Holly Szumila-Vance (20+10)      
+
| 8:50  ||    '''Charge Items 1b, 2a''': SBS GEM tracker and electronics, Observed performance at high luminosity  ||  Nilanga Liyanage, Holly Szumila-Vance     
 
|-
 
|-
| 9:20  ||    '''Charge Items 1c, 2b, and 5''': The simulation and data analysis software status for the experiment      ||    Andrew Puckett (20+10)  
+
| 9:20  ||    '''Charge Items 1c, 2b, and 5''': The simulation and data analysis software status for the experiment      ||    Andrew Puckett   
 
|-
 
|-
| 9:50  ||    '''Charge Item 3''': The responsibilities, manpower and other resources                                                      ||    Mark Jones (10+10)     
+
| 9:50  ||    '''Charge Item 3''': The responsibilities, manpower and other resources                                                      ||    Mark Jones    
 
|-
 
|-
|10:30  ||    '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations    ||  Jessie Butler (20+10)       
+
|10:30  ||    '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations    ||  Jessie Butler        
 
|-
 
|-
|11:00  ||    '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors                                        ||      Robin Wines (20+10)
+
|11:00  ||    '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors                                        ||      Robin Wines
 
|-
 
|-
|11:30  ||    '''Charge Item 1a''': Target and scattering chamber configuration        || S. Covrig Dusa (10+10)
+
|11:30  ||    '''Charge Item 1a''': Target and scattering chamber configuration        || S. Covrig Dusa
 
|-
 
|-
|13:00  ||    '''Charge Item 1d''': ECAL calorimeter  ||  Donald Jones (20+10)     
+
|13:00  ||    '''Charge Item 1d''': ECAL calorimeter  ||  Donald Jones      
 
|-
 
|-
|13:30  ||    '''Charge Item 1e''': Coordinate Detector  ||    Peter Monahan (20+10)
+
|13:30  ||    '''Charge Item 1e''': Coordinate Detector  ||    Peter Monahan  
 
|-
 
|-
|14:00  ||    '''Charge Item 1f and 5''': GEp experiment DAQ                    ||    Alex Camsonne(20+10)
+
|14:00  ||    '''Charge Item 1f and 5''': GEp experiment DAQ                    ||    Alex Camsonne  
 
|-
 
|-
|14:30  ||    '''Charge Item 1f''': Trigger based on fADC  ||  Ben Raydo (20+10) 
+
|14:30  ||    '''Charge Item 1f''': Trigger based on fADC  ||  Ben Raydo    
 
|-
 
|-
|15:50  ||    '''Charge Item 8''': The beam commissioning procedures and polarimetry    ||    William Henry (20+10)
+
|15:50  ||    '''Charge Item 8''': The beam commissioning procedures and polarimetry    ||    William Henry
 
|-
 
|-
|16:20  ||    '''Charge Item 7, 9''': Safety Documents for GEp    || Evaristo Cisbani (20+10)
+
|16:20  ||    '''Charge Item 7, 9''': Safety Documents for GEp    || Evaristo Cisbani
 
|-
 
|-
 
|}
 
|}

Revision as of 18:09, 31 March 2023

Experimental Readiness Review 2023

  • Date: April 24 2023 (Monday)
  • Location: L102
  • ERR Committee
  • ERR Charge ([1])
  • GEp Proposal ([2])
  • GEp Proposal Update ([3])

Agenda

Morning Session
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Chair (10)
8:30 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+10)
8:50 Charge Items 1b, 2a: SBS GEM tracker ([pdf]). Nilanga Liyanage, Holly Szumila-Vance (20+10)
9:20 Charge Items 1c, 2b, and 5: The simulation and data analysis software status for the experiment ([pdf]) Andrew Puckett (20+10)
9:50 Charge Item 3: The responsibilities, manpower and other resources ([pdf]) Mark Jones (10+10)
10:10 Break (20)
10:30 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) Jessie Butler (20+10)
11:00 Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) Robin Wines (20+10)
11:30 Charge Item 1a: Target and scattering chamber configuration ([pdf]) S. Covrig Dusa (10+10)
11:50 Lunch (70)
Afternoon Session
13:00 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+10)
13:30 Charge Item 1e: Coordinate Detector ([pdf]) Peter Monahan (20+10)
14:00 Charge Item 1f and 5: GEp experiment DAQ ([pdf]) Alex Camsonne(20+10)
14:30 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (20+10)
15:30 Break (20)
15:50 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (20+10)
16:20 Charge Item 7, 9: Safety Documents for GEp ([pdf]) Evaristo Cisbani (20+10)
16:50 Closed Session (40)
17:30 Closeout
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
Input for RSAD from Radcon (radiation budget form) (pdf)
OSP for Hadron Calorimeter, HCal-J (pdf)
OSP for Coordinate Detector, CDet (pdf)
OSP for GEM detectors (pdf)

More details on Content of the talks

8:30 Charge item 1: Concept of experiment, close to PAC update BogdanW
8:50 Charge Items 1b, 2a: SBS GEM tracker and electronics, Observed performance at high luminosity Nilanga Liyanage, Holly Szumila-Vance
9:20 Charge Items 1c, 2b, and 5: The simulation and data analysis software status for the experiment Andrew Puckett
9:50 Charge Item 3: The responsibilities, manpower and other resources Mark Jones
10:30 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations Jessie Butler
11:00 Charge Item 1: Design report including modifications to beamline, SBS and detectors Robin Wines
11:30 Charge Item 1a: Target and scattering chamber configuration S. Covrig Dusa
13:00 Charge Item 1d: ECAL calorimeter Donald Jones
13:30 Charge Item 1e: Coordinate Detector Peter Monahan
14:00 Charge Item 1f and 5: GEp experiment DAQ Alex Camsonne
14:30 Charge Item 1f: Trigger based on fADC Ben Raydo
15:50 Charge Item 8: The beam commissioning procedures and polarimetry William Henry
16:20 Charge Item 7, 9: Safety Documents for GEp Evaristo Cisbani