Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 61: Line 61:
 
| ||      Draft of ESAD ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn_ESAD.pdf pdf])  ||  
 
| ||      Draft of ESAD ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn_ESAD.pdf pdf])  ||  
 
|-
 
|-
| ||      Input for RSAD from Radcon (radiation budget form) ([https://hallaweb.jlab.org/wiki/images/e/e4/E12-07-109A.pdf pdf]) ||  
+
| ||      RSAD from Radcon ([https://hallaweb.jlab.org/wiki/images/e/e4/E12-07-109A.pdf pdf]) ||  
 
|-
 
|-
 
| ||    OSP for Hadron Calorimeter, HCal-J ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCal_OSP.pdf pdf])  ||  
 
| ||    OSP for Hadron Calorimeter, HCal-J ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCal_OSP.pdf pdf])  ||  

Revision as of 21:14, 2 April 2023

Experimental Readiness Review 2023

  • Date: April 24 2023 (Monday)
  • Location: L102
  • ERR Committee
  • ERR Charge ([1])
  • GEp Proposal ([2])
  • GEp Proposal Update ([3])

Agenda

Morning Session
8:00 Closed Session (20)
8:20 Remarks from Chair and Charge Chair (10)
8:30 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+10)
8:50 Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate ([pdf]). Nilanga Liyanage, Holly Szumila-Vance (20+10)
9:20 Charge Items 1c, 2b, and 6: Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment ([pdf]) Andrew Puckett (20+10)
9:50 Charge Item 3: The responsibilities, manpower and other resources ([pdf]) Mark Jones (10+10)
10:10 Break (20)
10:30 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) Jessie Butler (20+10)
11:00 Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) Robin Wines (20+10)
11:30 Charge Item 1a: Target and scattering chamber configuration ([pdf]) S. Covrig Dusa (10+10)
11:50 Lunch (70)
Afternoon Session
13:00 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+10)
13:30 Charge Item 1e: Coordinate Detector ([pdf]) Peter Monahan (20+10)
14:00 Charge Item 1f and 5: GEp experiment DAQ ([pdf]) Alex Camsonne(20+10)
14:30 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (20+10)
15:30 Break (20)
15:50 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (20+10)
16:20 Charge Item 7, 9: Safety Documents for GEp ([pdf]) Evaristo Cisbani (20+10)
16:50 Closed Session (40)
17:30 Closeout
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
RSAD from Radcon (pdf)
OSP for Hadron Calorimeter, HCal-J (pdf)
OSP for Coordinate Detector, CDet (pdf)
OSP for GEM detectors (pdf)

More details on Content of the talks

8:30 Charge item 1: Concept of GEp/SBS experiment, close to PAC update BogdanW
8:50 Charge Items 1b, 2a: SBS GEM tracker and electronics. Observed efficiency at high luminosity Nilanga Liyanage, Holly Szumila-Vance
9:20 Charge Items 1c, 2b, and 5: One analyzer polarimeter. Analyzing power; The simulation and data analysis software status Andrew Puckett
9:50 Charge Item 3: The responsibilities, manpower and other resources Mark Jones
10:30 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations Jessie Butler
11:00 Charge Item 1: Design report including modifications to beamline, SBS and detectors Robin Wines
11:30 Charge Item 1a: Target and scattering chamber configuration S. Covrig Dusa
13:00 Charge Item 1d: ECAL calorimeter Donald Jones
13:30 Charge Item 1e: Coordinate Detector. Peter Monahan
14:00 Charge Item 1f and 5: GEp experiment DAQ. The data volume expected for this experiment Alex Camsonne
14:30 Charge Item 1f: Trigger based on fADC Ben Raydo
15:50 Charge Item 8: The beam commissioning procedures and polarimetry William Henry
16:20 Charge Item 7, 9: Safety Documents for GEp Evaristo Cisbani