Difference between revisions of "Meeting 2024 03 13"
From Hall A Wiki
(→Cosmic and pedestal data from XW Layer 0) |
|||
Line 11: | Line 11: | ||
=== Cosmic and pedestal data from XW Layer 0 === | === Cosmic and pedestal data from XW Layer 0 === | ||
− | * Noise and Common mode comparisons : [[File:noise.pdf]] [[File: | + | * Noise and Common mode comparisons : [[File:noise.pdf]] [[File:commonmode.pdf]] |
− | * Cosmic data before and after shielding : [[File: | + | * Cosmic data before and after shielding : [[File:before.jpg]] [[File:after.jpg]] |
− | + | ||
=== Work plan for GEn-RP === | === Work plan for GEn-RP === |
Revision as of 10:16, 13 March 2024
GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am
Link to all previous meetings: GMn GEM Commissioning Meeting
Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!
Contents
GEM inventory for GEn-RP and GEp:
Cosmic and pedestal data from XW Layer 0
- Noise and Common mode comparisons : File:Noise.pdf File:Commonmode.pdf
- Cosmic data before and after shielding : File:Before.jpg File:After.jpg
Work plan for GEn-RP
- Started cabling inline SBS GEMs, crates moved to new racks. Waiting on cable tray and green block to begin cabling to MPDs.
- Need to hook up LV+HV after cables on SBS side are connected. After connected, need to get controls with Ellen.
- RP layers on the stack and need cabling.
- XW layer one completed except for an unresolved issue at one of the backplanes. Beginning work now on 2nd XW layer.
- Still XY layer in BB needs HV upgrade....this will probably happen once all other layers and installed and being tested since it should only take about a day or two to remove and complete.
- Ellen gave us a reboot switch, but I have not yet had time to connect and check it out.