Difference between revisions of "Meeting 2024 03 13"

From Hall A Wiki
Jump to: navigation, search
(Cosmic and pedestal data from XW Layer 0)
Line 11: Line 11:
  
 
=== Cosmic and pedestal data from XW Layer 0 ===
 
=== Cosmic and pedestal data from XW Layer 0 ===
* Noise and Common mode comparisons : [[File:noise.pdf]] [[File:Example.jpg]]
+
* Noise and Common mode comparisons : [[File:noise.pdf]] [[File:commonmode.pdf]]
* Cosmic data before and after shielding : [[File:Example.jpg]] [[File:Example.jpg]]
+
* Cosmic data before and after shielding : [[File:before.jpg]] [[File:after.jpg]]
 
+
  
 
=== Work plan for GEn-RP ===
 
=== Work plan for GEn-RP ===

Revision as of 10:16, 13 March 2024

GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am

Link to all previous meetings: GMn GEM Commissioning Meeting

Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!


GEM inventory for GEn-RP and GEp:

  • Inventory and plan: [1]
  • HV upgrade tracker: [2]

Cosmic and pedestal data from XW Layer 0

Work plan for GEn-RP

  • Started cabling inline SBS GEMs, crates moved to new racks. Waiting on cable tray and green block to begin cabling to MPDs.
  • Need to hook up LV+HV after cables on SBS side are connected. After connected, need to get controls with Ellen.
  • RP layers on the stack and need cabling.
  • XW layer one completed except for an unresolved issue at one of the backplanes. Beginning work now on 2nd XW layer.
  • Still XY layer in BB needs HV upgrade....this will probably happen once all other layers and installed and being tested since it should only take about a day or two to remove and complete.
  • Ellen gave us a reboot switch, but I have not yet had time to connect and check it out.

DAQ updates (Ben, Bryan, Alex)