(Created page with "* SBS side LV: ** Joe to connect, instruct on controls ** Ellen to install some controller and readback * SBS GEMs: ** Install XW into stack ** Finish signal cabling ** Conne...")
 
Line 4: Line 4:
  
 
* SBS GEMs:
 
* SBS GEMs:
** Install XW into stack
+
** Install XW into stack (week of 25-Mar)
** Finish signal cabling
+
** Finish signal cabling (asap)
** Connect to HV patches (all HV cables)
+
** Connect to HV patches (after HDMI cabling complete)
 
** Install scintillators until run start on inline stack
 
** Install scintillators until run start on inline stack
** reconnect gas to RP layers
+
** reconnect gas to RP layers (after BB XY work?)
** techs to install final shielding blocks around the electronics hut
+
** techs to install final shielding blocks around the electronics hut (after we are happy with the reboot connections in the bunker)
  
 
* BB GEMs:
 
* BB GEMs:
** Upgrade the XY HV, re-install
+
** Upgrade the XY HV, re-install (would like to have SBS troubleshooting going on at the same time so as not to hold this up)
  
 
* Readout:
 
* Readout:
** Balance VTP fibers amongst crates to optimize
+
** Balance VTP fibers amongst crates to optimize (after GEMs are installed)
** Ensure that reboot/troubleshooting script works for all crates
+
** Ensure that reboot/troubleshooting script works for all crates (after electronics is working)
  
 
* High voltage:
 
* High voltage:
** Finish channels in GUI
+
** Finish channels in GUI (in progress)
** replace small screws on radial connectors?
+
** replace small screws on radial connectors? (optional)
** move HV to working reboot script
+
** move HV to working reboot strip (when we have one)
** finalize script for GUI upload of HV and operation
+
** finalize script for GUI upload of HV and operation (in progress before 1-Apr)
  
* Update the documentation on the HV and LV operations
+
* Update the documentation on the HV and LV operations (before beam)
 +
* GEM experts on call (setup before beam)

Revision as of 12:11, 21 March 2024

  • SBS side LV:
    • Joe to connect, instruct on controls
    • Ellen to install some controller and readback
  • SBS GEMs:
    • Install XW into stack (week of 25-Mar)
    • Finish signal cabling (asap)
    • Connect to HV patches (after HDMI cabling complete)
    • Install scintillators until run start on inline stack
    • reconnect gas to RP layers (after BB XY work?)
    • techs to install final shielding blocks around the electronics hut (after we are happy with the reboot connections in the bunker)
  • BB GEMs:
    • Upgrade the XY HV, re-install (would like to have SBS troubleshooting going on at the same time so as not to hold this up)
  • Readout:
    • Balance VTP fibers amongst crates to optimize (after GEMs are installed)
    • Ensure that reboot/troubleshooting script works for all crates (after electronics is working)
  • High voltage:
    • Finish channels in GUI (in progress)
    • replace small screws on radial connectors? (optional)
    • move HV to working reboot strip (when we have one)
    • finalize script for GUI upload of HV and operation (in progress before 1-Apr)
  • Update the documentation on the HV and LV operations (before beam)
  • GEM experts on call (setup before beam)