Difference between revisions of "BigBite RPHodos"
From Hall A Wiki
(→Replay) |
(→Active Analyzer) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
== HV Controls == | == HV Controls == | ||
+ | go_hv | ||
+ | |||
+ | you need to use the JAVA GUI to load new HV settings | ||
+ | |||
+ | ssh -Y aslow@adaqsc | ||
+ | cd slowc/ | ||
+ | ./hvs LEFT | ||
== Side Hodoscope == | == Side Hodoscope == | ||
− | *PMT numbering | + | *PMT numbering, Looking beam left: PMT 0 is bottom left, 23 is top left, 24 is top right, 47 is bottom right. (Will provide pic) |
*FADC map | *FADC map | ||
*TDC map | *TDC map | ||
*Cosmic Trigger | *Cosmic Trigger | ||
+ | |||
== Active Analyzer == | == Active Analyzer == | ||
− | *PMT numbering | + | *PMT numbering, looking upstream. top row, left to right is 0,1,2,3 and it continues downwards (diagram coming soon) |
*FADC map | *FADC map | ||
*TDC map | *TDC map | ||
*Cosmic Trigger | *Cosmic Trigger | ||
− | |||
== Commissioning == | == Commissioning == |
Latest revision as of 12:00, 5 April 2024
Replay
ssh -Y a-onl@aonl2 gosbs cd GEnRP_replay/replay analyzer .L replay_genrp.C replay_genrp(*run number*, *events*)
HV Controls
go_hv
you need to use the JAVA GUI to load new HV settings
ssh -Y aslow@adaqsc cd slowc/ ./hvs LEFT
Side Hodoscope
- PMT numbering, Looking beam left: PMT 0 is bottom left, 23 is top left, 24 is top right, 47 is bottom right. (Will provide pic)
- FADC map
- TDC map
- Cosmic Trigger
Active Analyzer
- PMT numbering, looking upstream. top row, left to right is 0,1,2,3 and it continues downwards (diagram coming soon)
- FADC map
- TDC map
- Cosmic Trigger