Difference between revisions of "ECal Apr25 2024"

From Hall A Wiki
Jump to: navigation, search
Line 4: Line 4:
 
*Cable etc. update: Albert
 
*Cable etc. update: Albert
 
*Prototype heating test: Don
 
*Prototype heating test: Don
*PMT preparation and testing: Simona, Deb, Jimmy  
+
*PMT preparation and testing: Simona, Jimmy  
 
*Cooling system: Jimmy
 
*Cooling system: Jimmy
 
*Heater controls: Marc McMullen
 
*Heater controls: Marc McMullen
  
 
Minutes provided by Marc McMullen: [https://www.jlab.org/sites/default/files/dsg/minutes/hall_a/ECAL/2024-04-25%20ECAL%20Weekly%20Meeting_post.pdf]
 
Minutes provided by Marc McMullen: [https://www.jlab.org/sites/default/files/dsg/minutes/hall_a/ECAL/2024-04-25%20ECAL%20Weekly%20Meeting_post.pdf]

Revision as of 14:41, 17 May 2024

<<Back

ECal Weekly Meeting Apr. 25, 2024

  • Detector update: Don
  • Cable etc. update: Albert
  • Prototype heating test: Don
  • PMT preparation and testing: Simona, Jimmy
  • Cooling system: Jimmy
  • Heater controls: Marc McMullen

Minutes provided by Marc McMullen: [1]