Difference between revisions of "ECal Jun6 2024"

From Hall A Wiki
Jump to: navigation, search
(Created page with "<<Back =ECal Weekly Meeting June 6, 2024= *Timing of startup *Detector update: (heater power supply, cables, DAQ layout, cable map, placement of extra...")
 
(ECal Weekly Meeting June 6, 2024)
Line 9: Line 9:
 
*Cooling system: Jimmy
 
*Cooling system: Jimmy
 
*Heater controls: Marc McMullen
 
*Heater controls: Marc McMullen
 +
https://jlab-org.zoomgov.com/j/1613109323

Revision as of 09:02, 6 June 2024

<<Back

ECal Weekly Meeting June 6, 2024

  • Timing of startup
  • Detector update: (heater power supply, cables, DAQ layout, cable map, placement of extra cables) Don
  • Cable etc. update: Albert
  • Cookie test: Bogdan
  • Prototype heating test: Don
  • PMT preparation and testing: Simona, Jimmy
  • Cooling system: Jimmy
  • Heater controls: Marc McMullen

https://jlab-org.zoomgov.com/j/1613109323