Difference between revisions of "Feb 19 2025"

From Hall A Wiki
Jump to: navigation, search
(Created page with "Back to Main Page >> new DAQ Weekly meetings == Agenda == == Notes ==")
 
(Notes)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
  
 
== Notes ==
 
== Notes ==
 +
# LED pulser runs are used to calculate the dead time in the old DAQ
 +
# Old DAQ would do a ADC check with beam to see if there is a HV drift
 +
# Zhongling is able to use the calorimeter sum as the trigger for the new DAQ with the LED on
 +
# Steve is looking into how the LED pulser is enabled in the old DAQ; Looks like 3 outputs from the TI will be used to enable the LED system

Latest revision as of 11:27, 19 February 2025

Back to Main Page >> new DAQ Weekly meetings

Agenda

Notes

  1. LED pulser runs are used to calculate the dead time in the old DAQ
  2. Old DAQ would do a ADC check with beam to see if there is a HV drift
  3. Zhongling is able to use the calorimeter sum as the trigger for the new DAQ with the LED on
  4. Steve is looking into how the LED pulser is enabled in the old DAQ; Looks like 3 outputs from the TI will be used to enable the LED system