Difference between revisions of "Target Operator Check List"
From Hall A Wiki
(6 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
Target Operator Should Go Through This check list for every shift. | Target Operator Should Go Through This check list for every shift. | ||
+ | |||
+ | {{pass|New : PDF version of Target Operator Check List for Ay :}} [[Image:Target Operator Check List.Ay.pdf]] | ||
== Every Half Hour == | == Every Half Hour == | ||
Line 7: | Line 9: | ||
* Check Any Yellow Warning Messages or Controls | * Check Any Yellow Warning Messages or Controls | ||
− | == Every 2 | + | == Every 2 Hours == |
+ | |||
* Check polarization drift | * Check polarization drift | ||
* Check Cell Temperature | * Check Cell Temperature | ||
Line 16: | Line 19: | ||
* Screen Shot Pumping Laser Absorption Spectrum | * Screen Shot Pumping Laser Absorption Spectrum | ||
* Screen Shot Laser Control Window | * Screen Shot Laser Control Window | ||
− | * Screen Shot Cell Temperature Reading | + | * Screen Shot Cell Temperature Reading (Optional/Automatic) |
+ | * Screen Shot Oven Temperature Reading (Optional/AUtomatic) | ||
+ | * Screen Shot of Holding Field Current (Optional/Automatic) | ||
== After Call for Beam to MCC == | == After Call for Beam to MCC == | ||
Line 22: | Line 27: | ||
* Check Beam Current | * Check Beam Current | ||
* Check Trigger Rate | * Check Trigger Rate | ||
+ | |||
+ | == Every Time Do Reference Cell Measurment == | ||
+ | |||
+ | * Make sure the gas in reference cell is correct. If not sure, by getting the permission from Run Coordinator, first vent and evacuate the reference cell, then fill it with proper gas; | ||
+ | * Post a Halog with '''IN BEAM''' reference cell pressure and gas type. | ||
+ | |||
+ | == Every Time Vent and Evacuate the Reference Cell == | ||
+ | |||
+ | * First '''Vent.''' the cell until the pressure does not drop, record the readings from both '''Low Pressure Gauge''' and '''High Pressure Gauge'''; | ||
+ | * Then '''Evac.''' the cell until the pressure does not drop, record the readings from both '''Low Pressure Gauge''' and '''High Pressure Gauge'''; | ||
+ | * Post a Halog with all the readings recorded. |
Latest revision as of 18:22, 6 May 2009
Target Operator Should Go Through This check list for every shift.
New : PDF version of Target Operator Check List for Ay : File:Target Operator Check List.Ay.pdf
Contents
Every Half Hour
- Pumping Laser Absorption Spectrum
- No Error in Spin Flip Control Status Window
- 5 Heart Beats are on for Spin Flip Main Window
- Check Any Yellow Warning Messages or Controls
Every 2 Hours
- Check polarization drift
- Check Cell Temperature
- Check Oven Temperature
Every Shift
- Generate a Report from Spin Flip Main Window
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Laser Control Window
- Screen Shot Cell Temperature Reading (Optional/Automatic)
- Screen Shot Oven Temperature Reading (Optional/AUtomatic)
- Screen Shot of Holding Field Current (Optional/Automatic)
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate
Every Time Do Reference Cell Measurment
- Make sure the gas in reference cell is correct. If not sure, by getting the permission from Run Coordinator, first vent and evacuate the reference cell, then fill it with proper gas;
- Post a Halog with IN BEAM reference cell pressure and gas type.
Every Time Vent and Evacuate the Reference Cell
- First Vent. the cell until the pressure does not drop, record the readings from both Low Pressure Gauge and High Pressure Gauge;
- Then Evac. the cell until the pressure does not drop, record the readings from both Low Pressure Gauge and High Pressure Gauge;
- Post a Halog with all the readings recorded.