Difference between revisions of "Eed Target Operator Check List"

From Hall A Wiki
Jump to: navigation, search
(New page: Target Operator Should Go Through This check list for every shift. Keep '''EPICS Daemon''' and '''NMR_FrequencySweep_v9''' VIs running all the time == Every Half Hour == * Pumping Laser...)
 
Line 1: Line 1:
 
Target Operator Should Go Through This check list for every shift.
 
Target Operator Should Go Through This check list for every shift.
  
Keep '''EPICS Daemon''' and '''NMR_FrequencySweep_v9''' VIs running all the time
+
== Keep Running ==
 +
* '''EPICS Daemon.vi''': c:\AyeD\VI\Spin Flip\EPICS Daemon.vi
 +
* '''NMR_FrequencySweep_v9.vi''': c:\AyeD\VI\NMR\NMR_FrequencySweep_v9.vi
  
 
== Every Half Hour ==
 
== Every Half Hour ==

Revision as of 14:47, 13 May 2009

Target Operator Should Go Through This check list for every shift.

Keep Running

  • EPICS Daemon.vi: c:\AyeD\VI\Spin Flip\EPICS Daemon.vi
  • NMR_FrequencySweep_v9.vi: c:\AyeD\VI\NMR\NMR_FrequencySweep_v9.vi

Every Half Hour

  • Pumping Laser Absorption Spectrum
  • Check Cell Temperature
  • Check Oven Temperature

Every 4-6 Hours during 3He production

  • Do NMR Frequency sweep in between two production runs

Every Shift

  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Cell Temperature Reading (Optional/Automatic)
  • Screen Shot Oven Temperature Reading (Optional/AUtomatic)
  • Screen Shot of Holding Field Current (Optional/Automatic)

After Call for Beam from MCC

  • Check Raster Size (4x4, 7x5 MCC)
  • Check Beam Current (5uA)
  • Check Trigger Rate

Every Time Do Reference Cell Measurement

  • Make sure the gas in reference cell is correct. If not sure, by getting the permission from Run Coordinator, first vent and evacuate the reference cell, then fill it with proper gas;
  • Post a Halog with IN BEAM reference cell pressure and gas type.

Every Time Vent and Evacuate the Reference Cell

  • First Vent. the cell until the pressure does not drop, record the readings from both Low Pressure Gauge and High Pressure Gauge;
  • Then Evac. the cell until the pressure does not drop, record the readings from both Low Pressure Gauge and High Pressure Gauge;
  • Post a Halog with all the readings recorded.