Difference between revisions of "Work List"

From Hall A Wiki
Jump to: navigation, search
(Worklist table)
 
Line 1: Line 1:
 
+
{|border="1" style="text-align:left"
 
+
 
+
 
+
{|
+
 
|+ HAPPEx III Work List
 
|+ HAPPEx III Work List
 
! What !! Who !! Description
 
! What !! Who !! Description
Line 9: Line 5:
 
! DAQ  
 
! DAQ  
 
| Dustin
 
| Dustin
|  
+
| AutoDB and blinding
 
|-
 
|-
 
! Analysis chain  
 
! Analysis chain  
 
| Mark
 
| Mark
|
+
| Run analysis on HAPPEx II data
 
|-
 
|-
 
! Detector prep
 
! Detector prep
|
+
| Dustin
 
|
 
|
 
|-
 
|-
 
! Moller polarimeter
 
! Moller polarimeter
|
+
| Dustin
|
+
| Dustin, Luis and Sasha become experts at running the Moller polarimeter
 
|-
 
|-
 
! Compton polarimeter
 
! Compton polarimeter
|
+
| Mark
|
+
|  
 +
* Electron detector (Alex, Bob)
 +
* Increase IR cavity power (Mark)
 
|-
 
|-
 
! Accelerator dev/liason
 
! Accelerator dev/liason
 +
| Mark and Dustin
 
|
 
|
|
+
* Run 8 cables to source table (Riad)
 +
* Modulation
 
|-
 
|-
 
! Installation planning  
 
! Installation planning  
|
+
|  
|
+
|  
 +
* When is the detector going in?
 +
* What tools are needed?
 +
* <span style="color:red"> Give Ed a list of surveys that are required </span>
 
|-
 
|-
 
! Commissioning planning
 
! Commissioning planning
Line 39: Line 42:
 
|
 
|
 
|-
 
|-
! Documentation
+
! Documentation and administration
|
+
|  
 
|
 
|
 +
* COO, ESAD, TSOP must be produced.  Shift workers must be asked to read and sign before shift.
 +
* Target training must be organised and advertised.
 +
* <span style="color:gray"> Shift schedule and signup sheet (done) </span>
 +
* Run coordinator signup (Xiaochao)
 +
* Online documentation for shift workers
 
|-
 
|-
 
|}
 
|}

Revision as of 16:46, 11 July 2009

HAPPEx III Work List
What Who Description
DAQ Dustin AutoDB and blinding
Analysis chain Mark Run analysis on HAPPEx II data
Detector prep Dustin
Moller polarimeter Dustin Dustin, Luis and Sasha become experts at running the Moller polarimeter
Compton polarimeter Mark
  • Electron detector (Alex, Bob)
  • Increase IR cavity power (Mark)
Accelerator dev/liason Mark and Dustin
  • Run 8 cables to source table (Riad)
  • Modulation
Installation planning
  • When is the detector going in?
  • What tools are needed?
  • Give Ed a list of surveys that are required
Commissioning planning
Documentation and administration
  • COO, ESAD, TSOP must be produced. Shift workers must be asked to read and sign before shift.
  • Target training must be organised and advertised.
  • Shift schedule and signup sheet (done)
  • Run coordinator signup (Xiaochao)
  • Online documentation for shift workers