Difference between revisions of "Work List"

From Hall A Wiki
Jump to: navigation, search
(Removing all content from page)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{|border="1" style="text-align:left"
+
 
|+ HAPPEx III Work List
+
! What !! Who !! Description
+
|-
+
! DAQ
+
| Dustin
+
| AutoDB and blinding
+
|-
+
! Analysis chain
+
| Mark
+
| Run analysis on HAPPEx II data
+
|-
+
! Detector prep
+
| Dustin
+
|
+
|-
+
! Moller polarimeter
+
| Dustin
+
| Dustin, Luis and Sasha become experts at running the Moller polarimeter
+
|-
+
! Compton polarimeter
+
| Mark
+
|
+
* Electron detector (Alex, Bob)
+
* Increase IR cavity power (Mark)
+
|-
+
! Accelerator dev/liason
+
| Mark and Dustin
+
|
+
* Run 8 cables to source table (Riad)
+
* Modulation
+
|-
+
! Installation planning
+
|
+
|
+
* When is the detector going in?
+
* What tools are needed?
+
* <span style="color:red"> Give Ed a list of surveys that are required </span>
+
|-
+
! Commissioning planning
+
|
+
|
+
|-
+
! Documentation and administration
+
|
+
|
+
* COO, ESAD, TSOP must be produced.  Shift workers must be asked to read and sign before shift.
+
* Target training must be organised and advertised.
+
* <span style="color:gray"> Shift schedule and signup sheet (done) </span>
+
* Run coordinator signup (Xiaochao)
+
* Online documentation for shift workers
+
|-
+
|}
+

Latest revision as of 11:02, 14 July 2009