Difference between revisions of "Run Plan"

From Hall A Wiki
Jump to: navigation, search
Line 1: Line 1:
 
    
 
    
  
* [[  Beam line check]]
+
* Tune beam to 1 pass, Set HRS(L) and HRS(R).
 
    
 
    
 +
*      Move the HRSs to 15 (-15) Deg. HRSs calibration C(e,e') (elastic) with/ without sleeves.
  
*      HRSs checks]]
+
*      Move HRS(R) to 12.5 deg, Set BigBite at 68 Deg.
 
    
 
    
 +
*      Momentum scane for BigBite calibration, H(e,e'p) Kin A 1,2,3.
  
*      Momentum scane for BigBite commission, H(e,e'p) , H(e,p) and C(e,p) Kin A 1,2,3,6 (and Kin G2).
+
*      Energy change 1 pass to 2 pass.
  
*     Energy change 1 pass to 2 pass.
+
*     Continue calibration of BigBite H(e,e'p), D(e,e'p) and C(e,e'p) Kin A 4,5,  B 1,2 and C1
 
    
 
    
 +
*      Put the Neutron array (without the lead wall) at 50 Deg and 15 meters from target. Calibration of the HAND with   
  
*      Continue momentum scale for BigBite calibration, H(e,e'p), H(e,p) and C(e,p) Kin A 4,5 (and Kin C1,G1).
 
  
 
+
BigBite angle change. (Rotate BB to an angle so that there will be no obsticle in the line of sight from target to the n-array).
 
+
*    BigBite angle change. (Rotate BB to an angle so that there will be no obsticle in the line of sight from target to the n-array).
+
 
    
 
    
  

Revision as of 05:19, 1 April 2010


  • Tune beam to 1 pass, Set HRS(L) and HRS(R).
  • Move the HRSs to 15 (-15) Deg. HRSs calibration C(e,e') (elastic) with/ without sleeves.
  • Move HRS(R) to 12.5 deg, Set BigBite at 68 Deg.
  • Momentum scane for BigBite calibration, H(e,e'p) Kin A 1,2,3.
  • Energy change 1 pass to 2 pass.
  • Continue calibration of BigBite H(e,e'p), D(e,e'p) and C(e,e'p) Kin A 4,5, B 1,2 and C1
  • Put the Neutron array (without the lead wall) at 50 Deg and 15 meters from target. Calibration of the HAND with


BigBite angle change. (Rotate BB to an angle so that there will be no obsticle in the line of sight from target to the n-array).


  • n-array commision, Kin B1


  • Change set-up to BB and N-Array both at 99 Deg + Energy change 2 pass to 4 pass


  • Singles rates study


  • D(e,e'pn) X<1, Kin D1

End of commision

  • D(e,e'pn) X>1, Kin E1


  • SRC Run, low Momentum range, Kin F1


  • SRC Run, High Momentum range, Kin F2