Difference between revisions of "Setup as installed"
From Hall A Wiki
Line 1: | Line 1: | ||
Back to [[DVCS]] | Back to [[DVCS]] | ||
− | + | [[Photos]] | |
+ | |||
+ | Bellow is the setup we have decided on. | ||
==Target== | ==Target== |
Revision as of 23:03, 19 August 2010
Back to DVCS
Bellow is the setup we have decided on.
Target
- 15cm LH2 loop
- 15cm LD2 loop
- 15cm spare loop
Solid ladder:
- 15cm dummy
- C: 1mm foil
- Optics: Multi (7) 1mm C foils
- BeO
- Cross hair
- Empty
Left HRS
- S0
- S1
- S2
- Short Cerenkov
- Pion rejector