Difference between revisions of "Task assignement August 15th 2010"

From Hall A Wiki
Jump to: navigation, search
 
(11 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
Experiment tasks
 
Experiment tasks
 +
*scalers
 +
*sync check
 +
*HV
 +
*HRS calibration
 +
*Beamline cablibration
 +
*dead time
 +
*lumi
 +
  
  
Line 9: Line 17:
 
!Secondary expert
 
!Secondary expert
 
!Task list
 
!Task list
!Current
+
!Completion level / Completed / Left to be done
!Completion level
+
!Estimated completion date
 +
! Main task
 
|-
 
|-
 
|Alexandre Camsonne
 
|Alexandre Camsonne
| ARS DAQ, Trigger, Slow control, decoding
+
| ARS DAQ, Slow control, decoding, paperwork
|
+
| Trigger
 
|  
 
|  
   *ARS readout
+
   * ARS test readout
   *Buffering test
+
  * ARS final readout
   * HRS Trigger implementation
+
   * Buffering test
 +
   * DVCS HRS Trigger implementation
 
   * Test decoder
 
   * Test decoder
 
   * Slow control LED
 
   * Slow control LED
 
   * Slow control current ADC
 
   * Slow control current ADC
 
   * HRS integration
 
   * HRS integration
| ARS readout
+
  * COO
 +
  * ESAD
 +
  * RSAD
 +
  * TOSP
 
|
 
|
   *ARS readout
+
   * 40 % ( need implement checks and not working 100 % )
   *Buffering test
+
   * 20 % ( need read all boards )
   * HRS Trigger implementation
+
  * 30 % ( need connect busy and create buffered read out )
   * Test decoder
+
  * 0% ( when trigger logic is available )
   * Slow control LED
+
  * 60 % ( need implement checks )
   * Slow control current ADC
+
  * 50 % ( hardware ok - need write C functions driver and ROOT interface )
   * HRS integration
+
  * 70 % ( ADC and patch ready - need to cable and test )
   
+
   * 0% ( waiting for crates to be in HRS )
 +
   * 90 % ( need edit files )
 +
   * 30 % ( need adapt to DVCS )
 +
   * 20 % ( Pavel just go started on it )
 +
   * 0 % ( still not found old one )
 +
|
 +
  * 08/16/2010
 +
  * ?? need calorimeter trigger and crates
 +
  * in progress 08/14/2010
 +
  * 08/23/2010
 +
  * 08/13/2010
 +
  * 08/30/2010 ( 1 day )
 +
  * 08/16/2010 ( cabling needed )
 +
  * when everything in HRS, no later than september
 +
  * 08/12/2010
 +
  * 08/23/2010
 +
  * 08/23/2010
 +
  * 09/01/2010
 +
  | Buffering test
 
|-
 
|-
 
|Eric Fuchey
 
|Eric Fuchey
| Calibration pi0, Photon Compton
+
| Calibration pi0, Photon Compton, RG213
|
+
 
|
 
|
 
|
 
|
 
|
 
|
 +
| RG213
 
|-
 
|-
 
|Florian Itard
 
|Florian Itard
| Shift schedule
+
| Shift schedule, RG213
 
|
 
|
 
|
 
|
Line 56: Line 87:
 
|-
 
|-
 
| Hisham Albataineh
 
| Hisham Albataineh
 +
| RG213
 
|
 
|
 +
| RG213
 
|
 
|
|
+
| RG213
|
+
|
+
 
|-
 
|-
 
|Carlos Munoz
 
|Carlos Munoz
Line 82: Line 113:
 
| Run plan
 
| Run plan
 
| Run plan
 
| Run plan
 +
|
 +
|
 +
|-
 +
| Robert Michaels
 +
| Helicity, HRS trigger, CompSimple
 +
|
 +
|
 +
*Helicity
 +
*HRS trigger
 +
*CompSimple
 +
|
 +
* 80 % - checks left ?
 +
* 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
 +
*
 
|
 
|
 
|
 
|
Line 91: Line 136:
 
|
 
|
 
|
 
|
|}
+
|
 +
|-
 +
|Kalyan Allada
 +
| Lumi
 +
|
 +
|
 +
|
 +
|
 +
| Lumi
 +
}

Latest revision as of 18:25, 22 August 2010

Back to DVCS

Experiment tasks

  • scalers
  • sync check
  • HV
  • HRS calibration
  • Beamline cablibration
  • dead time
  • lumi


Name Expertise Secondary expert Task list Completion level / Completed / Left to be done Estimated completion date Main task
Alexandre Camsonne ARS DAQ, Slow control, decoding, paperwork Trigger
 * ARS test readout
 * ARS final readout
 * Buffering test
 * DVCS HRS Trigger implementation
 * Test decoder
 * Slow control LED
 * Slow control current ADC
 * HRS integration
 * COO
 * ESAD
 * RSAD
 * TOSP
 * 40 % ( need implement checks and not working 100 % )
 * 20 % ( need read all boards )
 * 30 % ( need connect busy and create buffered read out )
 * 0% ( when trigger logic is available )
 * 60 % ( need implement checks )
 * 50 % ( hardware ok - need write C functions driver and ROOT interface )
 * 70 % ( ADC and patch ready - need to cable and test )
 * 0% ( waiting for crates to be in HRS )
 * 90 % ( need edit files ) 
 * 30 % ( need adapt to DVCS )
 * 20 % ( Pavel just go started on it )
 * 0 % ( still not found old one )
 * 08/16/2010
 * ?? need calorimeter trigger and crates
 * in progress 08/14/2010
 * 08/23/2010
 * 08/13/2010 
 * 08/30/2010 ( 1 day )
 * 08/16/2010 ( cabling needed )
 * when everything in HRS, no later than september
 * 08/12/2010
 * 08/23/2010
 * 08/23/2010
 * 09/01/2010 
Buffering test
Eric Fuchey Calibration pi0, Photon Compton, RG213 RG213
Florian Itard Shift schedule, RG213
Magalie Magne Electronics ARS + Calorimeter triggger
Hisham Albataineh RG213 RG213 RG213
Carlos Munoz Software, Survey, (Elastic calibration ?),MySQL *Waveform analysis
 *Survey
Julie Roche Software, curing, cosmics paddle DVCS analysis on adaq DVCS analysis on adaq
Charles Hyde Run plan Run plan Run plan
Robert Michaels Helicity, HRS trigger, CompSimple
  • Helicity
  • HRS trigger
  • CompSimple
  • 80 % - checks left ?
  • 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
Sophia Iqbal ( until august 31st ) Online GUI, EPICS start/end run
Kalyan Allada Lumi Lumi

}