Difference between revisions of "Task assignement August 15th 2010"

From Hall A Wiki
Jump to: navigation, search
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
Experiment tasks
 
Experiment tasks
 +
*scalers
 +
*sync check
 +
*HV
 +
*HRS calibration
 +
*Beamline cablibration
 +
*dead time
 +
*lumi
 +
  
  
Line 17: Line 25:
 
| Trigger
 
| Trigger
 
|  
 
|  
* ARS test readout
+
  * ARS test readout
* ARS final readout
+
  * ARS final readout
* Buffering test
+
  * Buffering test
* DVCS HRS Trigger implementation
+
  * DVCS HRS Trigger implementation
* Test decoder
+
  * Test decoder
* Slow control LED
+
  * Slow control LED
* Slow control current ADC
+
  * Slow control current ADC
* HRS integration
+
  * HRS integration
* COO
+
  * COO
* ESAD
+
  * ESAD
* RSAD
+
  * RSAD
* TOSP
+
  * TOSP
 
|
 
|
* 40 % ( need implement checks and not working 100 % )
+
  * 40 % ( need implement checks and not working 100 % )
* 20 % ( need read all boards )
+
  * 20 % ( need read all boards )
* 30 % ( need connect busy and create buffered read out )
+
  * 30 % ( need connect busy and create buffered read out )
* 0% ( when trigger logic is available )
+
  * 0% ( when trigger logic is available )
* 60 % ( need implement checks )
+
  * 60 % ( need implement checks )
* 50 % ( hardware ok - need write C functions driver and ROOT interface )
+
  * 50 % ( hardware ok - need write C functions driver and ROOT interface )
* 70 % ( ADC and patch ready - need to cable and test )
+
  * 70 % ( ADC and patch ready - need to cable and test )
* 0% ( waiting for crates to be in HRS )
+
  * 0% ( waiting for crates to be in HRS )
* 90 % ( need edit files )  
+
  * 90 % ( need edit files )  
* 30 % ( need adapt to DVCS )
+
  * 30 % ( need adapt to DVCS )
* 20 % ( Pavel just go started on it )
+
  * 20 % ( Pavel just go started on it )
* 0 % ( still not found old one )
+
  * 0 % ( still not found old one )
 
|
 
|
*
+
  * 08/16/2010
*  
+
  * ?? need calorimeter trigger and crates
*  
+
  * in progress 08/14/2010
*  
+
  * 08/23/2010
*
+
  * 08/13/2010
*
+
  * 08/30/2010 ( 1 day )
*
+
  * 08/16/2010 ( cabling needed )
*
+
  * when everything in HRS, no later than september
*
+
  * 08/12/2010
*
+
  * 08/23/2010
*
+
  * 08/23/2010
*
+
  * 09/01/2010
*
+
 
  | Buffering test  
 
  | Buffering test  
 
|-
 
|-
Line 89: Line 96:
 
| Software, Survey, (Elastic calibration ?),MySQL
 
| Software, Survey, (Elastic calibration ?),MySQL
 
|
 
|
|
+
| *Waveform analysis
*Waveform analysis
+
  *Survey
*Survey
+
 
|
 
|
 
|
 
|
Line 131: Line 137:
 
|
 
|
 
|
 
|
 +
|-
 +
|Kalyan Allada
 +
| Lumi
 +
|
 +
|
 +
|
 +
|
 +
| Lumi
 
}
 
}

Latest revision as of 18:25, 22 August 2010

Back to DVCS

Experiment tasks

  • scalers
  • sync check
  • HV
  • HRS calibration
  • Beamline cablibration
  • dead time
  • lumi


Name Expertise Secondary expert Task list Completion level / Completed / Left to be done Estimated completion date Main task
Alexandre Camsonne ARS DAQ, Slow control, decoding, paperwork Trigger
 * ARS test readout
 * ARS final readout
 * Buffering test
 * DVCS HRS Trigger implementation
 * Test decoder
 * Slow control LED
 * Slow control current ADC
 * HRS integration
 * COO
 * ESAD
 * RSAD
 * TOSP
 * 40 % ( need implement checks and not working 100 % )
 * 20 % ( need read all boards )
 * 30 % ( need connect busy and create buffered read out )
 * 0% ( when trigger logic is available )
 * 60 % ( need implement checks )
 * 50 % ( hardware ok - need write C functions driver and ROOT interface )
 * 70 % ( ADC and patch ready - need to cable and test )
 * 0% ( waiting for crates to be in HRS )
 * 90 % ( need edit files ) 
 * 30 % ( need adapt to DVCS )
 * 20 % ( Pavel just go started on it )
 * 0 % ( still not found old one )
 * 08/16/2010
 * ?? need calorimeter trigger and crates
 * in progress 08/14/2010
 * 08/23/2010
 * 08/13/2010 
 * 08/30/2010 ( 1 day )
 * 08/16/2010 ( cabling needed )
 * when everything in HRS, no later than september
 * 08/12/2010
 * 08/23/2010
 * 08/23/2010
 * 09/01/2010 
Buffering test
Eric Fuchey Calibration pi0, Photon Compton, RG213 RG213
Florian Itard Shift schedule, RG213
Magalie Magne Electronics ARS + Calorimeter triggger
Hisham Albataineh RG213 RG213 RG213
Carlos Munoz Software, Survey, (Elastic calibration ?),MySQL *Waveform analysis
 *Survey
Julie Roche Software, curing, cosmics paddle DVCS analysis on adaq DVCS analysis on adaq
Charles Hyde Run plan Run plan Run plan
Robert Michaels Helicity, HRS trigger, CompSimple
  • Helicity
  • HRS trigger
  • CompSimple
  • 80 % - checks left ?
  • 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
Sophia Iqbal ( until august 31st ) Online GUI, EPICS start/end run
Kalyan Allada Lumi Lumi

}